Skip to content

NM 575-993-1511

TX 915-490-2654

AZ 520-405-1028

Let's Connect

NM 575-993-1511

TX 915-490-2654

AZ 520-405-1028

Let's Connect
  • Water Works
  • Sales
    • Brands
    • Chemical Feed Systems
    • Flow Meters
    • Instrumentation / Automation
    • Process Equipment
    • Sales Engineering
    • Consulting / Design Review
    • Installation
    • Training and Support
  • Training
  • Company
    • Timeline
    • Projects
    • Culture
      • Mission & Vision
      • Founding Mottos
      • Principal Values
      • Guiding Philosophy
  • Water Works
  • Sales
    • Brands
    • Chemical Feed Systems
    • Flow Meters
    • Instrumentation / Automation
    • Process Equipment
    • Sales Engineering
    • Consulting / Design Review
    • Installation
    • Training and Support
  • Training
  • Company
    • Timeline
    • Projects
    • Culture
      • Mission & Vision
      • Founding Mottos
      • Principal Values
      • Guiding Philosophy

WARMINSTER FIBERGLASS

FIBERGLASS SHELTERS

Author
Spectrum
December 27, 2021
View Our Projects

Water Works, Sales, and Training for Water Professionals by Water Professionals

New Mexico

HQ AND SERVICE CENTER
748 WEST PALMS
LAS CRUCES, NM 88007
575-993-1511

Texas

OFFICE (BY APPOINTMENT)
7362 REMCON CIRCLE
EL PASO, TX 79912
915-490-2654

Arizona

OFFICE (BY APPOINTMENT)
3430 E SUNRISE DRIVE,
SUITE 180
TUCSON, AZ 85718
520-405-1028

Let's Talk

COPYRIGHT © 2021 | PUREOPS.COM |  ALL RIGHTS RESERVED | WEBSITE BY SPECTRUM TECHNOLOGIES

Loading...
New Hydro Instruments OMNI Valve after installation

Rio Well Chlorine Pacing Valve Replacement

New Hydro Instruments OMNI Valve after installation
Customer: Flagstaff Water Services
Design Engineer: PureOps
Location: Flagstaff, AZ
Date: April 2025
PureOps Price: $8,500

PureOps removes and replaces chlorine pacing valve at a well site in Flagstaff, AZ.

Scope of Work:

Site prep; remove existing equipment; install a new Hydro Instruments OMNI Valve; conduct startup, testing, and staff training

Scope of Supply:

  • (1) Hydro Instruments Wall Panel OMNI Valve, 0-25 PPD w/ Bypass Plumbing & VM-150 Vacuum Monitor
  • (1) Hydro Instruments Vertical In-Line Check Valve, 100 PPD Max
  • Miscellaneous tools and materials for installation
Existing non-operational chlorine pacing valve
Existing non-operational chlorine pacing valve
New Hydro Instruments OMNI Valve after installation
Training Flagstaff Water Services staff on new equipment
Training Flagstaff Water Services staff on new equipment
Explore

Rio Well Chlorine Pacing Valve Replacement

New Hydro Instruments OMNI Valve after installation
Customer: Flagstaff Water Services
Design Engineer: PureOps
Location: Flagstaff, AZ
Date: April 2025
PureOps Price: $8,500

PureOps removes and replaces chlorine pacing valve at a well site in Flagstaff, AZ.

Scope of Work:

Site prep; remove existing equipment; install a new Hydro Instruments OMNI Valve; conduct startup, testing, and staff training

Scope of Supply:

  • (1) Hydro Instruments Wall Panel OMNI Valve, 0-25 PPD w/ Bypass Plumbing & VM-150 Vacuum Monitor
  • (1) Hydro Instruments Vertical In-Line Check Valve, 100 PPD Max
  • Miscellaneous tools and materials for installation
Existing non-operational chlorine pacing valve
Existing non-operational chlorine pacing valve
New Hydro Instruments OMNI Valve after installation
Training Flagstaff Water Services staff on new equipment
Training Flagstaff Water Services staff on new equipment

Rio Well Chlorine Pacing Valve Replacement

Flagstaff, AZ
Finished Sand Separator installation

NMSU Well 10 Improvements

Finished Sand Separator installation
Customer: New Mexico State University
Design Engineer: PureOps
Location: Las Cruces, NM
Date: May 2025
PureOps Price: $190,000

PureOps replaces production well packing gland with mechanical seal, replaces LAKOS Sand Separator, and installs ProMinent chemical dosing pump skids at a domestic water production facility for New Mexico State University.

Scope of Work:

Remove production well packing gland and replace with new mechanical seal to include pulling of well head and motor, custom discharge head machining, resetting discharge head, and testing; Demolish and remove old LAKOS Sand Separator including 12” carbon steel piping, flanges, and on-site fabrication; Remove and replace existing chemical dosing pumps with automated ProMinent chemical pump skids and related piping connections.

Scope of Supply:

  • (1) John Crane Mechanical Seal, Machined Shaft and Related Accessories
  • (1) New ProMinent Polyphosphate Dual Pump Skid
  • (1) New ProMinent Sodium Hypochlorite Dual Pump Skid
  • (1) New LAKOS PWC-1080-L Sand Separator System with Auto Purge Valve, includes related piping, fittings, and fabrication services
Existing LAKOS Sand Separator before removal
Removed Sand Separator and installation preparation
New LAKOS Sand Separator during installation and fabrication
Removal of discharge head and packing gland
Removal of discharge head
Completed mechanical seal installation and resetting of discharge head
PureOps team member installing chemical pump skids
Completed ProMinent chemical pump skid
Explore

NMSU Well 10 Improvements

Finished Sand Separator installation
Customer: New Mexico State University
Design Engineer: PureOps
Location: Las Cruces, NM
Date: May 2025
PureOps Price: $190,000

PureOps replaces production well packing gland with mechanical seal, replaces LAKOS Sand Separator, and installs ProMinent chemical dosing pump skids at a domestic water production facility for New Mexico State University.

Scope of Work:

Remove production well packing gland and replace with new mechanical seal to include pulling of well head and motor, custom discharge head machining, resetting discharge head, and testing; Demolish and remove old LAKOS Sand Separator including 12” carbon steel piping, flanges, and on-site fabrication; Remove and replace existing chemical dosing pumps with automated ProMinent chemical pump skids and related piping connections.

Scope of Supply:

  • (1) John Crane Mechanical Seal, Machined Shaft and Related Accessories
  • (1) New ProMinent Polyphosphate Dual Pump Skid
  • (1) New ProMinent Sodium Hypochlorite Dual Pump Skid
  • (1) New LAKOS PWC-1080-L Sand Separator System with Auto Purge Valve, includes related piping, fittings, and fabrication services
Existing LAKOS Sand Separator before removal
Removed Sand Separator and installation preparation
New LAKOS Sand Separator during installation and fabrication
Removal of discharge head and packing gland
Removal of discharge head
Completed mechanical seal installation and resetting of discharge head
PureOps team member installing chemical pump skids
Completed ProMinent chemical pump skid

NMSU Well 10 Improvements

Las Cruces, NM

Smart Valve Replacement and ChlorTainer Maintenance

Customer: Fountain Hills Sanitary District
Design Engineer: PureOps
Location: Fountain Hills, AZ
Date: October 2024
PureOps Price: $16,000

PureOps performs upgrades for Fountain Hills Sanitary District including replacement of smart valves and annual service of ChlorTainer vessels.

Scope of Work:

Remove and replace vessel o-rings; remove and replace chlorine feed lines; repair and re-pack Whitey isolation valves; remove and replace closure locking nut gaskets; grease all lubrication ports and closure mechanisms; remove and replace (3) Regal Smart Valves with new units including vacuum tubing and tubing connectors; pressure and vacuum testing after completed work.

Scope of Supply:

  • (3) Regal Model 7001 Smart Valves Ranging from 100 to 500 PPD, Wall Mounting Plates, and Junction Boxes
  • (3) ChlorTainer Containment Vessel Service Package including:
    • Replacement of Vessel O-Rings
    • Chlorine Feed Lines, 38"
    • Whitey Isolation Valve Rebuild Kits
    • 40" Vessel w/ Closure Locking Nut Gasket
Explore

Smart Valve Replacement and ChlorTainer Maintenance

Customer: Fountain Hills Sanitary District
Design Engineer: PureOps
Location: Fountain Hills, AZ
Date: October 2024
PureOps Price: $16,000

PureOps performs upgrades for Fountain Hills Sanitary District including replacement of smart valves and annual service of ChlorTainer vessels.

Scope of Work:

Remove and replace vessel o-rings; remove and replace chlorine feed lines; repair and re-pack Whitey isolation valves; remove and replace closure locking nut gaskets; grease all lubrication ports and closure mechanisms; remove and replace (3) Regal Smart Valves with new units including vacuum tubing and tubing connectors; pressure and vacuum testing after completed work.

Scope of Supply:

  • (3) Regal Model 7001 Smart Valves Ranging from 100 to 500 PPD, Wall Mounting Plates, and Junction Boxes
  • (3) ChlorTainer Containment Vessel Service Package including:
    • Replacement of Vessel O-Rings
    • Chlorine Feed Lines, 38"
    • Whitey Isolation Valve Rebuild Kits
    • 40" Vessel w/ Closure Locking Nut Gasket

Smart Valve Replacement and ChlorTainer Maintenance

Fountain Hills, AZ

Vista Real Pressure Tank Replacement

Customer: Vista Real Mobile Home Park
Design Engineer: PureOps
Location: Las Cruces, NM
Date: June 2024
PureOps Price: $52,000

PureOps field crew performs the replacement of an aged and leaking hydropneumatic pressure tank and roof structure at the Vista Real Mobile Home Park.

Scope of Work:

Remove roof over tank building and prepare site for work; isolate wells from distribution system; drain old pressure tank; disconnect existing 2” galvanized steel plumbing from old pressure tank; subcontract with a crane services company for the removal of existing tank; hoist tank out of the station with crane and rigging; grind down and remove steel stand from concrete floor; install new schedule 80 PVC well piping to feed the bank of (4) new bladder tanks; install new 2” copper lines and pro-press fittings on distribution zones; connect distribution zones to the bladder tank manifold; pressure test and disinfect new piping and tanks; return the system back to service for the community; replace old roof with new framing and new roofing materials.

Scope of Supply:

  • (4) 185 Elbi Gallon Bladder Tanks
  • Various 2” PVC and 2” copper piping, fittings, and isolation valves
  • Various ancillary accessories / equipment (well control pressure switch, gauges, conduit, etc.)
  • Completely new roofing structure and roofing materials (elastomeric roof system)
Explore

Vista Real Pressure Tank Replacement

Customer: Vista Real Mobile Home Park
Design Engineer: PureOps
Location: Las Cruces, NM
Date: June 2024
PureOps Price: $52,000

PureOps field crew performs the replacement of an aged and leaking hydropneumatic pressure tank and roof structure at the Vista Real Mobile Home Park.

Scope of Work:

Remove roof over tank building and prepare site for work; isolate wells from distribution system; drain old pressure tank; disconnect existing 2” galvanized steel plumbing from old pressure tank; subcontract with a crane services company for the removal of existing tank; hoist tank out of the station with crane and rigging; grind down and remove steel stand from concrete floor; install new schedule 80 PVC well piping to feed the bank of (4) new bladder tanks; install new 2” copper lines and pro-press fittings on distribution zones; connect distribution zones to the bladder tank manifold; pressure test and disinfect new piping and tanks; return the system back to service for the community; replace old roof with new framing and new roofing materials.

Scope of Supply:

  • (4) 185 Elbi Gallon Bladder Tanks
  • Various 2” PVC and 2” copper piping, fittings, and isolation valves
  • Various ancillary accessories / equipment (well control pressure switch, gauges, conduit, etc.)
  • Completely new roofing structure and roofing materials (elastomeric roof system)

Vista Real Pressure Tank Replacement

Las Cruces, NM

AZ Water Association 97th Annual Conference

Location: Phoenix Convention Center
Date: April 2024

PureOps travels to Phoenix, AZ for the 97th Annual AZ Water Association Conference to exhibit, network, and scout.

Scope of Work:

Set up PureOps booth in exhibition hall; exhibit for a full 2 days during conference week; network with attendees and exchange contact information for potential new clients and leads; visit with existing customers, clients, and vendors; scout for potential candidates for 2 new positions within PureOps AZ; Give away fun branded promo items and swag bags; provide attendees with printed media including line cards, business cards, and hiring cards.

Additional Info:

The 97th Annual AZ Water Association Conference resulted in the highest attendance to date — nearly 3,000 attendees.

Explore

AZ Water Association 97th Annual Conference

Location: Phoenix Convention Center
Date: April 2024

PureOps travels to Phoenix, AZ for the 97th Annual AZ Water Association Conference to exhibit, network, and scout.

Scope of Work:

Set up PureOps booth in exhibition hall; exhibit for a full 2 days during conference week; network with attendees and exchange contact information for potential new clients and leads; visit with existing customers, clients, and vendors; scout for potential candidates for 2 new positions within PureOps AZ; Give away fun branded promo items and swag bags; provide attendees with printed media including line cards, business cards, and hiring cards.

Additional Info:

The 97th Annual AZ Water Association Conference resulted in the highest attendance to date — nearly 3,000 attendees.

AZ Water Association 97th Annual Conference

Phoenix, AZ

Fabens Meter Replacement

Customer: City of Fabens
Design Engineer: PureOps
Location: Fabens, TX
Date: July 2024
PureOps Price: $10,300

PureOps performs a 12” meter replacement in the late hours of the night to avoid water outages to the town of Fabens, TX.

Scope of Work:

Remove 12” McCrometer Mag Meter from booster station discharge manifold; clean piping and flange faces; install 12” E+H Mag Meter; check for leaks; install flow display wiring; check proper operation.

Scope of Supply:

  • (1) Endress + Hauser 12” Promag W 400, Mag Meter w/ Integral Display
Explore

Fabens Meter Replacement

Customer: City of Fabens
Design Engineer: PureOps
Location: Fabens, TX
Date: July 2024
PureOps Price: $10,300

PureOps performs a 12” meter replacement in the late hours of the night to avoid water outages to the town of Fabens, TX.

Scope of Work:

Remove 12” McCrometer Mag Meter from booster station discharge manifold; clean piping and flange faces; install 12” E+H Mag Meter; check for leaks; install flow display wiring; check proper operation.

Scope of Supply:

  • (1) Endress + Hauser 12” Promag W 400, Mag Meter w/ Integral Display

Fabens Meter Replacement

Fabens, TX
1 2 … 5 Next »