CHEMICAL FEED SYSTEMS:
CHEMICAL DOSING PUMPS
PROCESS EQUIPMENT:
PUMPS | BOOSTER AND SPLIT CASE PUMPS; VERTICAL TURBINES; PUMP CONTROLS
CHEMICAL FEED SYSTEMS:
CHEMICAL DOSING PUMPS
PROCESS EQUIPMENT:
PUMPS | BOOSTER AND SPLIT CASE PUMPS; VERTICAL TURBINES; PUMP CONTROLS
Water Works, Sales, and Training for Water Professionals by Water Professionals
HQ AND SERVICE CENTER
748 WEST PALMS
LAS CRUCES, NM 88007
575-993-1511
OFFICE (BY APPOINTMENT)
7362 REMCON CIRCLE
EL PASO, TX 79912
915-490-2654
OFFICE (BY APPOINTMENT)
3430 E SUNRISE DRIVE,
SUITE 180
TUCSON, AZ 85718
520-405-1028
PureOps field crew performs the replacement of an aged and leaking hydropneumatic pressure tank and roof structure at the Vista Real Mobile Home Park.
Scope of Work:
Remove roof over tank building and prepare site for work; isolate wells from distribution system; drain old pressure tank; disconnect existing 2” galvanized steel plumbing from old pressure tank; subcontract with a crane services company for the removal of existing tank; hoist tank out of the station with crane and rigging; grind down and remove steel stand from concrete floor; install new schedule 80 PVC well piping to feed the bank of (4) new bladder tanks; install new 2” copper lines and pro-press fittings on distribution zones; connect distribution zones to the bladder tank manifold; pressure test and disinfect new piping and tanks; return the system back to service for the community; replace old roof with new framing and new roofing materials.
Scope of Supply:
PureOps field crew performs the replacement of an aged and leaking hydropneumatic pressure tank and roof structure at the Vista Real Mobile Home Park.
Scope of Work:
Remove roof over tank building and prepare site for work; isolate wells from distribution system; drain old pressure tank; disconnect existing 2” galvanized steel plumbing from old pressure tank; subcontract with a crane services company for the removal of existing tank; hoist tank out of the station with crane and rigging; grind down and remove steel stand from concrete floor; install new schedule 80 PVC well piping to feed the bank of (4) new bladder tanks; install new 2” copper lines and pro-press fittings on distribution zones; connect distribution zones to the bladder tank manifold; pressure test and disinfect new piping and tanks; return the system back to service for the community; replace old roof with new framing and new roofing materials.
Scope of Supply:
PureOps travels to Phoenix, AZ for the 97th Annual AZ Water Association Conference to exhibit, network, and scout.
Scope of Work:
Set up PureOps booth in exhibition hall; exhibit for a full 2 days during conference week; network with attendees and exchange contact information for potential new clients and leads; visit with existing customers, clients, and vendors; scout for potential candidates for 2 new positions within PureOps AZ; Give away fun branded promo items and swag bags; provide attendees with printed media including line cards, business cards, and hiring cards.
Additional Info:
The 97th Annual AZ Water Association Conference resulted in the highest attendance to date — nearly 3,000 attendees.
PureOps travels to Phoenix, AZ for the 97th Annual AZ Water Association Conference to exhibit, network, and scout.
Scope of Work:
Set up PureOps booth in exhibition hall; exhibit for a full 2 days during conference week; network with attendees and exchange contact information for potential new clients and leads; visit with existing customers, clients, and vendors; scout for potential candidates for 2 new positions within PureOps AZ; Give away fun branded promo items and swag bags; provide attendees with printed media including line cards, business cards, and hiring cards.
Additional Info:
The 97th Annual AZ Water Association Conference resulted in the highest attendance to date — nearly 3,000 attendees.
PureOps performs a 12” meter replacement in the late hours of the night to avoid water outages to the town of Fabens, TX.
Scope of Work:
Remove 12” McCrometer Mag Meter from booster station discharge manifold; clean piping and flange faces; install 12” E+H Mag Meter; check for leaks; install flow display wiring; check proper operation.
Scope of Supply:
PureOps performs a 12” meter replacement in the late hours of the night to avoid water outages to the town of Fabens, TX.
Scope of Work:
Remove 12” McCrometer Mag Meter from booster station discharge manifold; clean piping and flange faces; install 12” E+H Mag Meter; check for leaks; install flow display wiring; check proper operation.
Scope of Supply:
PureOps travels to Fort Worth, TX for the 29th Annual Texas Water Conference to attend, network, and scout.
Scope of Work:
Arrive for check in on the morning of the conference; make rounds to visit each booth within the exhibition hall; visit with current PureOps vendors and customers; scout for potential new leads and clients; attend a dinner sales meeting with Evoqua Water Technologies.
Additional Info:
Texas Water is the joint annual conference of the Water Environment Association of Texas and the Texas Section American Water Works Association. It’s the largest regional water conference in the USA.
PureOps travels to Fort Worth, TX for the 29th Annual Texas Water Conference to attend, network, and scout.
Scope of Work:
Arrive for check in on the morning of the conference; make rounds to visit each booth within the exhibition hall; visit with current PureOps vendors and customers; scout for potential new leads and clients; attend a dinner sales meeting with Evoqua Water Technologies.
Additional Info:
Texas Water is the joint annual conference of the Water Environment Association of Texas and the Texas Section American Water Works Association. It’s the largest regional water conference in the USA.
PureOps builds a reverse osmosis water treatment facility from the ground up for Spaceport America, completing the most extensive project to-date for PureOps.
Scope of Work:
Coordinate engineering and construction services of 30’ x 60’ CMU building to include foundation prep, concrete slab, roll-up door, electrical, HVAC, custom
roofing system, and related site work to house water treatment equipment; design, size, build, and install reverse osmosis membrane skid (complete with controls, water softener, staging tank, booster pumps, control valves, chemical injection, and CIP systems)
Scope of Supply:
PureOps builds a reverse osmosis water treatment facility from the ground up for Spaceport America, completing the most extensive project to-date for PureOps.
Scope of Work:
Coordinate engineering and construction services of 30’ x 60’ CMU building to include foundation prep, concrete slab, roll-up door, electrical, HVAC, custom
roofing system, and related site work to house water treatment equipment; design, size, build, and install reverse osmosis membrane skid (complete with controls, water softener, staging tank, booster pumps, control valves, chemical injection, and CIP systems)
Scope of Supply:
PureOps gives the NMSU Transfer Pump Station a “facelift” including cleaning, new paint, and other aesthetic improvements.
Scope of Work:
Remove old paint from floors and piping; prep pumps and piping for new paint; clean room; paint pumps and piping.
Scope of Supply:
PureOps gives the NMSU Transfer Pump Station a “facelift” including cleaning, new paint, and other aesthetic improvements.
Scope of Work:
Remove old paint from floors and piping; prep pumps and piping for new paint; clean room; paint pumps and piping.
Scope of Supply: