PureOps installs ABB mag meter for Lower Rio Grande PWWA.
El Centro Meter Installation
Doña Ana County, NM
Water Works, Sales, and Training for Water Professionals by Water Professionals
HQ AND SERVICE CENTER
748 WEST PALMS
LAS CRUCES, NM 88007
575-993-1511
OFFICE (BY APPOINTMENT)
7362 REMCON CIRCLE
EL PASO, TX 79912
915-490-2654
OFFICE (BY APPOINTMENT)
5151 E BROADWAY BLVD, SUITE 160
TUCSON, AZ 85711
520-405-1028
PureOps designs, supplies, and builds replacement Evaporator Systems, High Capacity Vacuum Regulators, Inlet Filters, Pressure Reducing Valves, Floor Cabinet Pacing Valves, and High Capacity Chlorine Ejectors for WWTP in El Paso, TX.
Scope of Work:
Scope of Supply:
PureOps designs, supplies, and builds replacement Evaporator Systems, High Capacity Vacuum Regulators, Inlet Filters, Pressure Reducing Valves, Floor Cabinet Pacing Valves, and High Capacity Chlorine Ejectors for WWTP in El Paso, TX.
Scope of Work:
Scope of Supply:
PureOps replaces 28 turbine meters ranging from 3” to 6” throughout the Town of Pecos production well field.
PureOps replaces 28 turbine meters ranging from 3” to 6” throughout the Town of Pecos production well field.
PureOps de-and-re-commissions major gas chlorine system (24 one-ton cylinders) for El Paso Water, supplying and installing Hydro Instruments vacuum regulators (16,000 PPD), ball valves, chlorine filters, gauges, pressure relief valves, and related accessories.
PureOps de-and-re-commissions major gas chlorine system (24 one-ton cylinders) for El Paso Water, supplying and installing Hydro Instruments vacuum regulators (16,000 PPD), ball valves, chlorine filters, gauges, pressure relief valves, and related accessories.