Skip to content

NM 575-993-1511

TX 915-490-2654

AZ 520-405-1028

Let's Connect

NM 575-993-1511

TX 915-490-2654

AZ 520-405-1028

Let's Connect
  • Water Works
  • Sales
    • Brands
    • Chemical Feed Systems
    • Flow Meters
    • Instrumentation / Automation
    • Process Equipment
    • Sales Engineering
    • Consulting / Design Review
    • Installation
    • Training and Support
  • Training
  • Company
    • Timeline
    • Projects
    • Culture
      • Mission & Vision
      • Founding Mottos
      • Principal Values
      • Guiding Philosophy
Menu
  • Water Works
  • Sales
    • Brands
    • Chemical Feed Systems
    • Flow Meters
    • Instrumentation / Automation
    • Process Equipment
    • Sales Engineering
    • Consulting / Design Review
    • Installation
    • Training and Support
  • Training
  • Company
    • Timeline
    • Projects
    • Culture
      • Mission & Vision
      • Founding Mottos
      • Principal Values
      • Guiding Philosophy

Timeline

1987
1987

Mario goes water pro

1987-2011
1987-2011

Mario does the work, serving in various municipal and non-profit capacities, as well as performing certified operator side gigs

2004
2004

Mario formalizes the side jobs, setting up shop out of the good ol' home office and coining the name "Pure Operations" (later DBAed to just "PureOps")

2004 - 2010
2004 - 2010

Mario focuses on Water Works, namely Operator of Record and Technical Assistance services primarily for underserved colonias in southern New Mexico

2010
2010

Mario lands his 10th small water system contract, revving up pressure to take PureOps full-time

2011
2011

Mario makes the leap, leaving his day job and opening up PureOps to the Land of Enchantment at large

PureOps, approached by Regal, becomes the preferred, factory-authorized sales representative, formally taking PureOps into Sales

PureOps becomes preferred, factory-authorized sales representative of Force Flow

2012
2012

PureOps makes first hires, and "TeamOps" is born

PureOps goes brick-and-mortar, christening the brand new "HQ and Service Center" in Las Cruces, NM

PureOps inks deal to become certified operator for space, well for Spaceport America, the world's first purpose-built commercial spaceport

PureOps supplies its first-ever complete lift station, serving the needs of Pueblo of Santa Ana

2013
2013

PureOps begins servicing the Lone Star State

PureOps becomes exclusive sales representative of Halogen Valve Systems

PureOps established as Chlorination-Experts, serving El Paso Electric's gas chlorination service needs

2014
2014

PureOps completes first turnkey production well (300-gallon), with all the bells and whistles — and the well building to boot — serving the needs of Picacho MDWCA

2015
2015

PureOps expands competencies, formalizing Meter Services and Leak Detection services through the acquisition of Great Southwest Meter Testing

2016
2016

PureOps becomes exclusive sales representative of Hydro Instruments

PureOps established as Subject-Matter-Experts, serving the Inter Tribal Council of Arizona’s technical assistance and training needs for tribal governments throughout the Southwest and beyond

2017
2017

PureOps forms Training services business unit

2018
2018

PureOps becomes exclusive sales representative of Master Meter as well as AllChem / Horizon Water Care Products

PureOps de-and-re-commissions major gas chlorine system (24 one-ton cylinders) for El Paso Water, supplying and installing Hydro Instruments vacuum regulators (16,000 PPD), ball valves, chlorine filters, gauges, pressure relief valves, and related accessories. 

2019
2019

PureOps receives clearance to embark on phase one of an AMR radio meter solution for Lake Section Water Company, installing 600 Master Meter Allegro meters (with approximately 4,000 remaining for subsequent phases)

2020
2020

PureOps begins servicing the Grand Canyon State

PureOps becomes exclusive sales representative of Purafil and sales representative of Endress + Hauser products 

2021
2021

PureOps hits milestone, establishing over 50 sales representative relationships 

2022
2022

PureOps performs first-ever scrubber replacement for 1-ton mitigation, supplying El Paso Water with Purafil chlorine emergency gas scrubber, including full start-up service

2023
2023

PureOps becomes sales representative of Evoqua and sales service partner of ChlorTainer

Company

Water Works, Sales, and Training for Water Professionals by Water Professionals

New Mexico

HQ AND SERVICE CENTER
748 WEST PALMS
LAS CRUCES, NM 88007
575-993-1511

Texas

OFFICE (BY APPOINTMENT)
7362 REMCON CIRCLE
EL PASO, TX 79912
915-490-2654

Arizona

OFFICE (BY APPOINTMENT)
5151 E BROADWAY BLVD, SUITE 160
TUCSON, AZ 85711
520-405-1028

Let's Talk

COPYRIGHT © 2021 | PUREOPS.COM |  ALL RIGHTS RESERVED | WEBSITE BY SPECTRUM TECHNOLOGIES

Loading...

Town of Pecos Meter Replacement

Customer: Town of Pecos
Loacation: Pecos, TX
Date: 2017-2018, multiple project phases over the course of 18 months
PureOps Price: $150,000

PureOps replaces 28 turbine meters ranging from 3” to 6” throughout the Town of Pecos production well field.

  • Mobilization/demobilization
  • Decommissioned existing meters
  • Installed meters and related plumbing including new spools of pipe and flange adapters
  • Installed electrical conduit from control panels to meter locations, as well as new power supply leads and connections
  • Installed overload relays and communication via 4-20 mA signal
  • Start-up and testing of all equipment, including hydrostatic testing of plumbing and mechanical joints
Explore

Town of Pecos Meter Replacement

Customer: Town of Pecos
Loacation: Pecos, TX
Date: 2017-2018, multiple project phases over the course of 18 months
PureOps Price: $150,000

PureOps replaces 28 turbine meters ranging from 3” to 6” throughout the Town of Pecos production well field.

  • Mobilization/demobilization
  • Decommissioned existing meters
  • Installed meters and related plumbing including new spools of pipe and flange adapters
  • Installed electrical conduit from control panels to meter locations, as well as new power supply leads and connections
  • Installed overload relays and communication via 4-20 mA signal
  • Start-up and testing of all equipment, including hydrostatic testing of plumbing and mechanical joints

Town of Pecos Meter Replacement

Pecos, TX

El Paso Water Chlorine Gas System

Customer: El Paso Water
Loacation: El Paso, TX
Date: 2018, one-week project
PureOps Price: $55,000

PureOps de-and-re-commissions major gas chlorine system (24 one-ton cylinders) for El Paso Water, supplying and installing Hydro Instruments vacuum regulators (16,000 PPD), ball valves, chlorine filters, gauges, pressure relief valves, and related accessories.

  • Decommissioned existing wall mount chlorine vacuum regulators and manifold plumbing, including chlorine filters, ball valves, gauges, pressure relief valves, and related accessories
  • Supplied and installed two sets of Hydro Instruments 8000 PPD wall mount vacuum regulators, ball valves, chlorine filters, gauges, pressure relief valves, and related accessories
  • Tested pressure and vacuum on all equipment
Explore

El Paso Water Chlorine Gas System

Customer: El Paso Water
Loacation: El Paso, TX
Date: 2018, one-week project
PureOps Price: $55,000

PureOps de-and-re-commissions major gas chlorine system (24 one-ton cylinders) for El Paso Water, supplying and installing Hydro Instruments vacuum regulators (16,000 PPD), ball valves, chlorine filters, gauges, pressure relief valves, and related accessories.

  • Decommissioned existing wall mount chlorine vacuum regulators and manifold plumbing, including chlorine filters, ball valves, gauges, pressure relief valves, and related accessories
  • Supplied and installed two sets of Hydro Instruments 8000 PPD wall mount vacuum regulators, ball valves, chlorine filters, gauges, pressure relief valves, and related accessories
  • Tested pressure and vacuum on all equipment

El Paso Water Chlorine Gas System

El Paso, TX

Picacho MDWCA Turnkey Production Well

Customer: Picacho MDWCA
Loacation: Las Cruces, NM
Date: 2012-2013, three-month project
Customer Estimated Cost: $240,000
PureOps Price: $110,000

PureOps completes first turnkey production well (300-gallon), with all the bells and whistles — and the well building to boot — serving the needs of Picacho MDWCA.

Supply and Installation of Equipment

  • Clamp-on ultrasonic flow meter
  • Polyphosphate injection system
  • Chlorine gas injection system, including chlorine scales, automatic shut off actuators, gas detection equipment, injection booster pump, and chlorine residual analyzer
  • Motor controls and all related electrical and SCADA equipment

Construction of 24’ x 13’ Well House

  • Cement pad and foundation
  • Tie-in newly drilled well to the distribution system
  • Installation of 6” pump control and diaphragm check valves
  • Discharge basin and pond area
  • Construction of gravel access road
Explore

Picacho MDWCA Turnkey Production Well

Customer: Picacho MDWCA
Loacation: Las Cruces, NM
Date: 2012-2013, three-month project
Customer Estimated Cost: $240,000
PureOps Price: $110,000

PureOps completes first turnkey production well (300-gallon), with all the bells and whistles — and the well building to boot — serving the needs of Picacho MDWCA.

Supply and Installation of Equipment

  • Clamp-on ultrasonic flow meter
  • Polyphosphate injection system
  • Chlorine gas injection system, including chlorine scales, automatic shut off actuators, gas detection equipment, injection booster pump, and chlorine residual analyzer
  • Motor controls and all related electrical and SCADA equipment

Construction of 24’ x 13’ Well House

  • Cement pad and foundation
  • Tie-in newly drilled well to the distribution system
  • Installation of 6” pump control and diaphragm check valves
  • Discharge basin and pond area
  • Construction of gravel access road

Picacho MDWCA Turnkey Production Well

Las Cruces, NM