PureOps field crew performs the replacement of an aged and leaking hydropneumatic pressure tank and roof structure at the Vista Real Mobile Home Park.
Scope of Work:
Remove roof over tank building and prepare site for work; isolate wells from distribution system; drain old pressure tank; disconnect existing 2” galvanized steel plumbing from old pressure tank; subcontract with a crane services company for the removal of existing tank; hoist tank out of the station with crane and rigging; grind down and remove steel stand from concrete floor; install new schedule 80 PVC well piping to feed the bank of (4) new bladder tanks; install new 2” copper lines and pro-press fittings on distribution zones; connect distribution zones to the bladder tank manifold; pressure test and disinfect new piping and tanks; return the system back to service for the community; replace old roof with new framing and new roofing materials.
Scope of Supply:
- (4) 185 Elbi Gallon Bladder Tanks
- Various 2” PVC and 2” copper piping, fittings, and isolation valves
- Various ancillary accessories / equipment (well control pressure switch, gauges, conduit, etc.)
- Completely new roofing structure and roofing materials (elastomeric roof system)