Skip to content

NM 575-993-1511

TX 915-490-2654

AZ 520-405-1028

Let's Connect

NM 575-993-1511

TX 915-490-2654

AZ 520-405-1028

Let's Connect
  • Water Works
  • Sales
    • Brands
    • Chemical Feed Systems
    • Flow Meters
    • Instrumentation / Automation
    • Process Equipment
    • Sales Engineering
    • Consulting / Design Review
    • Installation
    • Training and Support
  • Training
  • Company
    • Timeline
    • Projects
    • Culture
      • Mission & Vision
      • Founding Mottos
      • Principal Values
      • Guiding Philosophy
Menu
  • Water Works
  • Sales
    • Brands
    • Chemical Feed Systems
    • Flow Meters
    • Instrumentation / Automation
    • Process Equipment
    • Sales Engineering
    • Consulting / Design Review
    • Installation
    • Training and Support
  • Training
  • Company
    • Timeline
    • Projects
    • Culture
      • Mission & Vision
      • Founding Mottos
      • Principal Values
      • Guiding Philosophy

PANAMETRICS (GE)

INDUSTRIAL METERS

Author
Spectrum
December 27, 2021
View Our Projects

Water Works, Sales, and Training for Water Professionals by Water Professionals

New Mexico

HQ AND SERVICE CENTER
748 WEST PALMS
LAS CRUCES, NM 88007
575-993-1511

Texas

OFFICE (BY APPOINTMENT)
7362 REMCON CIRCLE
EL PASO, TX 79912
915-490-2654

Arizona

OFFICE (BY APPOINTMENT)
5151 E BROADWAY BLVD, SUITE 160
TUCSON, AZ 85711
520-405-1028

Let's Talk

COPYRIGHT © 2021 | PUREOPS.COM |  ALL RIGHTS RESERVED | WEBSITE BY SPECTRUM TECHNOLOGIES

Loading...

Town of Pecos Meter Replacement

Customer: Town of Pecos
Loacation: Pecos, TX
Date: 2017-2018, multiple project phases over the course of 18 months
PureOps Price: $150,000

PureOps replaces 28 turbine meters ranging from 3” to 6” throughout the Town of Pecos production well field.

  • Mobilization/demobilization
  • Decommissioned existing meters
  • Installed meters and related plumbing including new spools of pipe and flange adapters
  • Installed electrical conduit from control panels to meter locations, as well as new power supply leads and connections
  • Installed overload relays and communication via 4-20 mA signal
  • Start-up and testing of all equipment, including hydrostatic testing of plumbing and mechanical joints
Explore

Town of Pecos Meter Replacement

Customer: Town of Pecos
Loacation: Pecos, TX
Date: 2017-2018, multiple project phases over the course of 18 months
PureOps Price: $150,000

PureOps replaces 28 turbine meters ranging from 3” to 6” throughout the Town of Pecos production well field.

  • Mobilization/demobilization
  • Decommissioned existing meters
  • Installed meters and related plumbing including new spools of pipe and flange adapters
  • Installed electrical conduit from control panels to meter locations, as well as new power supply leads and connections
  • Installed overload relays and communication via 4-20 mA signal
  • Start-up and testing of all equipment, including hydrostatic testing of plumbing and mechanical joints

Town of Pecos Meter Replacement

Pecos, TX

El Paso Water Chlorine Gas System

Customer: El Paso Water
Loacation: El Paso, TX
Date: 2018, one-week project
PureOps Price: $55,000

PureOps de-and-re-commissions major gas chlorine system (24 one-ton cylinders) for El Paso Water, supplying and installing Hydro Instruments vacuum regulators (16,000 PPD), ball valves, chlorine filters, gauges, pressure relief valves, and related accessories.

  • Decommissioned existing wall mount chlorine vacuum regulators and manifold plumbing, including chlorine filters, ball valves, gauges, pressure relief valves, and related accessories
  • Supplied and installed two sets of Hydro Instruments 8000 PPD wall mount vacuum regulators, ball valves, chlorine filters, gauges, pressure relief valves, and related accessories
  • Tested pressure and vacuum on all equipment
Explore

El Paso Water Chlorine Gas System

Customer: El Paso Water
Loacation: El Paso, TX
Date: 2018, one-week project
PureOps Price: $55,000

PureOps de-and-re-commissions major gas chlorine system (24 one-ton cylinders) for El Paso Water, supplying and installing Hydro Instruments vacuum regulators (16,000 PPD), ball valves, chlorine filters, gauges, pressure relief valves, and related accessories.

  • Decommissioned existing wall mount chlorine vacuum regulators and manifold plumbing, including chlorine filters, ball valves, gauges, pressure relief valves, and related accessories
  • Supplied and installed two sets of Hydro Instruments 8000 PPD wall mount vacuum regulators, ball valves, chlorine filters, gauges, pressure relief valves, and related accessories
  • Tested pressure and vacuum on all equipment

El Paso Water Chlorine Gas System

El Paso, TX

Picacho MDWCA Turnkey Production Well

Customer: Picacho MDWCA
Loacation: Las Cruces, NM
Date: 2012-2013, three-month project
Customer Estimated Cost: $240,000
PureOps Price: $110,000

PureOps completes first turnkey production well (300-gallon), with all the bells and whistles — and the well building to boot — serving the needs of Picacho MDWCA.

Supply and Installation of Equipment

  • Clamp-on ultrasonic flow meter
  • Polyphosphate injection system
  • Chlorine gas injection system, including chlorine scales, automatic shut off actuators, gas detection equipment, injection booster pump, and chlorine residual analyzer
  • Motor controls and all related electrical and SCADA equipment

Construction of 24’ x 13’ Well House

  • Cement pad and foundation
  • Tie-in newly drilled well to the distribution system
  • Installation of 6” pump control and diaphragm check valves
  • Discharge basin and pond area
  • Construction of gravel access road
Explore

Picacho MDWCA Turnkey Production Well

Customer: Picacho MDWCA
Loacation: Las Cruces, NM
Date: 2012-2013, three-month project
Customer Estimated Cost: $240,000
PureOps Price: $110,000

PureOps completes first turnkey production well (300-gallon), with all the bells and whistles — and the well building to boot — serving the needs of Picacho MDWCA.

Supply and Installation of Equipment

  • Clamp-on ultrasonic flow meter
  • Polyphosphate injection system
  • Chlorine gas injection system, including chlorine scales, automatic shut off actuators, gas detection equipment, injection booster pump, and chlorine residual analyzer
  • Motor controls and all related electrical and SCADA equipment

Construction of 24’ x 13’ Well House

  • Cement pad and foundation
  • Tie-in newly drilled well to the distribution system
  • Installation of 6” pump control and diaphragm check valves
  • Discharge basin and pond area
  • Construction of gravel access road

Picacho MDWCA Turnkey Production Well

Las Cruces, NM