Skip to content

NM 575-993-1511

TX 915-490-2654

AZ 520-405-1028

Let's Connect

NM 575-993-1511

TX 915-490-2654

AZ 520-405-1028

Let's Connect
  • Water Works
  • Sales
    • Brands
    • Chemical Feed Systems
    • Flow Meters
    • Instrumentation / Automation
    • Process Equipment
    • Sales Engineering
    • Consulting / Design Review
    • Installation
    • Training and Support
  • Training
  • Company
    • Timeline
    • Projects
    • Culture
      • Mission & Vision
      • Founding Mottos
      • Principal Values
      • Guiding Philosophy
  • Water Works
  • Sales
    • Brands
    • Chemical Feed Systems
    • Flow Meters
    • Instrumentation / Automation
    • Process Equipment
    • Sales Engineering
    • Consulting / Design Review
    • Installation
    • Training and Support
  • Training
  • Company
    • Timeline
    • Projects
    • Culture
      • Mission & Vision
      • Founding Mottos
      • Principal Values
      • Guiding Philosophy

Projects

New Hydro Instruments OMNI Valve after installation

Rio Well Chlorine Pacing Valve Replacement

New Hydro Instruments OMNI Valve after installation
Customer: Flagstaff Water Services
Design Engineer: PureOps
Location: Flagstaff, AZ
Date: April 2025
PureOps Price: $8,500

PureOps removes and replaces chlorine pacing valve at a well site in Flagstaff, AZ.

Scope of Work:

Site prep; remove existing equipment; install a new Hydro Instruments OMNI Valve; conduct startup, testing, and staff training

Scope of Supply:

  • (1) Hydro Instruments Wall Panel OMNI Valve, 0-25 PPD w/ Bypass Plumbing & VM-150 Vacuum Monitor
  • (1) Hydro Instruments Vertical In-Line Check Valve, 100 PPD Max
  • Miscellaneous tools and materials for installation
Existing non-operational chlorine pacing valve
Existing non-operational chlorine pacing valve
New Hydro Instruments OMNI Valve after installation
Training Flagstaff Water Services staff on new equipment
Training Flagstaff Water Services staff on new equipment
Explore

Rio Well Chlorine Pacing Valve Replacement

New Hydro Instruments OMNI Valve after installation
Customer: Flagstaff Water Services
Design Engineer: PureOps
Location: Flagstaff, AZ
Date: April 2025
PureOps Price: $8,500

PureOps removes and replaces chlorine pacing valve at a well site in Flagstaff, AZ.

Scope of Work:

Site prep; remove existing equipment; install a new Hydro Instruments OMNI Valve; conduct startup, testing, and staff training

Scope of Supply:

  • (1) Hydro Instruments Wall Panel OMNI Valve, 0-25 PPD w/ Bypass Plumbing & VM-150 Vacuum Monitor
  • (1) Hydro Instruments Vertical In-Line Check Valve, 100 PPD Max
  • Miscellaneous tools and materials for installation
Existing non-operational chlorine pacing valve
Existing non-operational chlorine pacing valve
New Hydro Instruments OMNI Valve after installation
Training Flagstaff Water Services staff on new equipment
Training Flagstaff Water Services staff on new equipment

Rio Well Chlorine Pacing Valve Replacement

Flagstaff, AZ
Finished Sand Separator installation

NMSU Well 10 Improvements

Finished Sand Separator installation
Customer: New Mexico State University
Design Engineer: PureOps
Location: Las Cruces, NM
Date: May 2025
PureOps Price: $190,000

PureOps replaces production well packing gland with mechanical seal, replaces LAKOS Sand Separator, and installs ProMinent chemical dosing pump skids at a domestic water production facility for New Mexico State University.

Scope of Work:

Remove production well packing gland and replace with new mechanical seal to include pulling of well head and motor, custom discharge head machining, resetting discharge head, and testing; Demolish and remove old LAKOS Sand Separator including 12” carbon steel piping, flanges, and on-site fabrication; Remove and replace existing chemical dosing pumps with automated ProMinent chemical pump skids and related piping connections.

Scope of Supply:

  • (1) John Crane Mechanical Seal, Machined Shaft and Related Accessories
  • (1) New ProMinent Polyphosphate Dual Pump Skid
  • (1) New ProMinent Sodium Hypochlorite Dual Pump Skid
  • (1) New LAKOS PWC-1080-L Sand Separator System with Auto Purge Valve, includes related piping, fittings, and fabrication services
Existing LAKOS Sand Separator before removal
Removed Sand Separator and installation preparation
New LAKOS Sand Separator during installation and fabrication
Removal of discharge head and packing gland
Removal of discharge head
Completed mechanical seal installation and resetting of discharge head
PureOps team member installing chemical pump skids
Completed ProMinent chemical pump skid
Explore

NMSU Well 10 Improvements

Finished Sand Separator installation
Customer: New Mexico State University
Design Engineer: PureOps
Location: Las Cruces, NM
Date: May 2025
PureOps Price: $190,000

PureOps replaces production well packing gland with mechanical seal, replaces LAKOS Sand Separator, and installs ProMinent chemical dosing pump skids at a domestic water production facility for New Mexico State University.

Scope of Work:

Remove production well packing gland and replace with new mechanical seal to include pulling of well head and motor, custom discharge head machining, resetting discharge head, and testing; Demolish and remove old LAKOS Sand Separator including 12” carbon steel piping, flanges, and on-site fabrication; Remove and replace existing chemical dosing pumps with automated ProMinent chemical pump skids and related piping connections.

Scope of Supply:

  • (1) John Crane Mechanical Seal, Machined Shaft and Related Accessories
  • (1) New ProMinent Polyphosphate Dual Pump Skid
  • (1) New ProMinent Sodium Hypochlorite Dual Pump Skid
  • (1) New LAKOS PWC-1080-L Sand Separator System with Auto Purge Valve, includes related piping, fittings, and fabrication services
Existing LAKOS Sand Separator before removal
Removed Sand Separator and installation preparation
New LAKOS Sand Separator during installation and fabrication
Removal of discharge head and packing gland
Removal of discharge head
Completed mechanical seal installation and resetting of discharge head
PureOps team member installing chemical pump skids
Completed ProMinent chemical pump skid

NMSU Well 10 Improvements

Las Cruces, NM

Smart Valve Replacement and ChlorTainer Maintenance

Customer: Fountain Hills Sanitary District
Design Engineer: PureOps
Location: Fountain Hills, AZ
Date: October 2024
PureOps Price: $16,000

PureOps performs upgrades for Fountain Hills Sanitary District including replacement of smart valves and annual service of ChlorTainer vessels.

Scope of Work:

Remove and replace vessel o-rings; remove and replace chlorine feed lines; repair and re-pack Whitey isolation valves; remove and replace closure locking nut gaskets; grease all lubrication ports and closure mechanisms; remove and replace (3) Regal Smart Valves with new units including vacuum tubing and tubing connectors; pressure and vacuum testing after completed work.

Scope of Supply:

  • (3) Regal Model 7001 Smart Valves Ranging from 100 to 500 PPD, Wall Mounting Plates, and Junction Boxes
  • (3) ChlorTainer Containment Vessel Service Package including:
    • Replacement of Vessel O-Rings
    • Chlorine Feed Lines, 38"
    • Whitey Isolation Valve Rebuild Kits
    • 40" Vessel w/ Closure Locking Nut Gasket
Explore

Smart Valve Replacement and ChlorTainer Maintenance

Customer: Fountain Hills Sanitary District
Design Engineer: PureOps
Location: Fountain Hills, AZ
Date: October 2024
PureOps Price: $16,000

PureOps performs upgrades for Fountain Hills Sanitary District including replacement of smart valves and annual service of ChlorTainer vessels.

Scope of Work:

Remove and replace vessel o-rings; remove and replace chlorine feed lines; repair and re-pack Whitey isolation valves; remove and replace closure locking nut gaskets; grease all lubrication ports and closure mechanisms; remove and replace (3) Regal Smart Valves with new units including vacuum tubing and tubing connectors; pressure and vacuum testing after completed work.

Scope of Supply:

  • (3) Regal Model 7001 Smart Valves Ranging from 100 to 500 PPD, Wall Mounting Plates, and Junction Boxes
  • (3) ChlorTainer Containment Vessel Service Package including:
    • Replacement of Vessel O-Rings
    • Chlorine Feed Lines, 38"
    • Whitey Isolation Valve Rebuild Kits
    • 40" Vessel w/ Closure Locking Nut Gasket

Smart Valve Replacement and ChlorTainer Maintenance

Fountain Hills, AZ

Vista Real Pressure Tank Replacement

Customer: Vista Real Mobile Home Park
Design Engineer: PureOps
Location: Las Cruces, NM
Date: June 2024
PureOps Price: $52,000

PureOps field crew performs the replacement of an aged and leaking hydropneumatic pressure tank and roof structure at the Vista Real Mobile Home Park.

Scope of Work:

Remove roof over tank building and prepare site for work; isolate wells from distribution system; drain old pressure tank; disconnect existing 2” galvanized steel plumbing from old pressure tank; subcontract with a crane services company for the removal of existing tank; hoist tank out of the station with crane and rigging; grind down and remove steel stand from concrete floor; install new schedule 80 PVC well piping to feed the bank of (4) new bladder tanks; install new 2” copper lines and pro-press fittings on distribution zones; connect distribution zones to the bladder tank manifold; pressure test and disinfect new piping and tanks; return the system back to service for the community; replace old roof with new framing and new roofing materials.

Scope of Supply:

  • (4) 185 Elbi Gallon Bladder Tanks
  • Various 2” PVC and 2” copper piping, fittings, and isolation valves
  • Various ancillary accessories / equipment (well control pressure switch, gauges, conduit, etc.)
  • Completely new roofing structure and roofing materials (elastomeric roof system)
Explore

Vista Real Pressure Tank Replacement

Customer: Vista Real Mobile Home Park
Design Engineer: PureOps
Location: Las Cruces, NM
Date: June 2024
PureOps Price: $52,000

PureOps field crew performs the replacement of an aged and leaking hydropneumatic pressure tank and roof structure at the Vista Real Mobile Home Park.

Scope of Work:

Remove roof over tank building and prepare site for work; isolate wells from distribution system; drain old pressure tank; disconnect existing 2” galvanized steel plumbing from old pressure tank; subcontract with a crane services company for the removal of existing tank; hoist tank out of the station with crane and rigging; grind down and remove steel stand from concrete floor; install new schedule 80 PVC well piping to feed the bank of (4) new bladder tanks; install new 2” copper lines and pro-press fittings on distribution zones; connect distribution zones to the bladder tank manifold; pressure test and disinfect new piping and tanks; return the system back to service for the community; replace old roof with new framing and new roofing materials.

Scope of Supply:

  • (4) 185 Elbi Gallon Bladder Tanks
  • Various 2” PVC and 2” copper piping, fittings, and isolation valves
  • Various ancillary accessories / equipment (well control pressure switch, gauges, conduit, etc.)
  • Completely new roofing structure and roofing materials (elastomeric roof system)

Vista Real Pressure Tank Replacement

Las Cruces, NM

AZ Water Association 97th Annual Conference

Location: Phoenix Convention Center
Date: April 2024

PureOps travels to Phoenix, AZ for the 97th Annual AZ Water Association Conference to exhibit, network, and scout.

Scope of Work:

Set up PureOps booth in exhibition hall; exhibit for a full 2 days during conference week; network with attendees and exchange contact information for potential new clients and leads; visit with existing customers, clients, and vendors; scout for potential candidates for 2 new positions within PureOps AZ; Give away fun branded promo items and swag bags; provide attendees with printed media including line cards, business cards, and hiring cards.

Additional Info:

The 97th Annual AZ Water Association Conference resulted in the highest attendance to date — nearly 3,000 attendees.

Explore

AZ Water Association 97th Annual Conference

Location: Phoenix Convention Center
Date: April 2024

PureOps travels to Phoenix, AZ for the 97th Annual AZ Water Association Conference to exhibit, network, and scout.

Scope of Work:

Set up PureOps booth in exhibition hall; exhibit for a full 2 days during conference week; network with attendees and exchange contact information for potential new clients and leads; visit with existing customers, clients, and vendors; scout for potential candidates for 2 new positions within PureOps AZ; Give away fun branded promo items and swag bags; provide attendees with printed media including line cards, business cards, and hiring cards.

Additional Info:

The 97th Annual AZ Water Association Conference resulted in the highest attendance to date — nearly 3,000 attendees.

AZ Water Association 97th Annual Conference

Phoenix, AZ

Fabens Meter Replacement

Customer: City of Fabens
Design Engineer: PureOps
Location: Fabens, TX
Date: July 2024
PureOps Price: $10,300

PureOps performs a 12” meter replacement in the late hours of the night to avoid water outages to the town of Fabens, TX.

Scope of Work:

Remove 12” McCrometer Mag Meter from booster station discharge manifold; clean piping and flange faces; install 12” E+H Mag Meter; check for leaks; install flow display wiring; check proper operation.

Scope of Supply:

  • (1) Endress + Hauser 12” Promag W 400, Mag Meter w/ Integral Display
Explore

Fabens Meter Replacement

Customer: City of Fabens
Design Engineer: PureOps
Location: Fabens, TX
Date: July 2024
PureOps Price: $10,300

PureOps performs a 12” meter replacement in the late hours of the night to avoid water outages to the town of Fabens, TX.

Scope of Work:

Remove 12” McCrometer Mag Meter from booster station discharge manifold; clean piping and flange faces; install 12” E+H Mag Meter; check for leaks; install flow display wiring; check proper operation.

Scope of Supply:

  • (1) Endress + Hauser 12” Promag W 400, Mag Meter w/ Integral Display

Fabens Meter Replacement

Fabens, TX

29th Annual Texas Water Conference

Location: Fort Worth Convention Center
Date: April 2024

PureOps travels to Fort Worth, TX for the 29th Annual Texas Water Conference to attend, network, and scout.

Scope of Work:

Arrive for check in on the morning of the conference; make rounds to visit each booth within the exhibition hall; visit with current PureOps vendors and customers; scout for potential new leads and clients; attend a dinner sales meeting with Evoqua Water Technologies.

Additional Info:

Texas Water is the joint annual conference of the Water Environment Association of Texas and the Texas Section American Water Works Association. It’s the largest regional water conference in the USA.

Explore

29th Annual Texas Water Conference

Location: Fort Worth Convention Center
Date: April 2024

PureOps travels to Fort Worth, TX for the 29th Annual Texas Water Conference to attend, network, and scout.

Scope of Work:

Arrive for check in on the morning of the conference; make rounds to visit each booth within the exhibition hall; visit with current PureOps vendors and customers; scout for potential new leads and clients; attend a dinner sales meeting with Evoqua Water Technologies.

Additional Info:

Texas Water is the joint annual conference of the Water Environment Association of Texas and the Texas Section American Water Works Association. It’s the largest regional water conference in the USA.

29th Annual Texas Water Conference

Fort Worth, TX

Spaceport Reverse Osmosis Treatment Plant

Customer: NM Spaceport Authority
Design Engineer: PureOps
Location: Spaceport America Aerospace Facility — Truth or Consequences, NM
Date: October-December 2024
PureOps Price: $1.2M

PureOps builds a reverse osmosis water treatment facility from the ground up for Spaceport America, completing the most extensive project to-date for PureOps.

Scope of Work:

Coordinate engineering and construction services of 30’ x 60’ CMU building to include foundation prep, concrete slab, roll-up door, electrical, HVAC, custom
roofing system, and related site work to house water treatment equipment; design, size, build, and install reverse osmosis membrane skid (complete with controls, water softener, staging tank, booster pumps, control valves, chemical injection, and CIP systems)

Scope of Supply:

  • Complete turn-key engineering services by stamped NM P.E.
  • Foundation, rebar work and 3,000 PSI concrete pad
  • CMU Block to match existing infrastructure
  • Custom roofing system, garage door, and personnel door
  • 200A electrical service to building to include interior panels, disconnects, lighting, and 480V service to Reverse Osmosis Skid
  • Dual split system HVAC building climate control
  • 5,000 gallon staging tank inside of building
  • Booster pumps, water softener, pre filtration, and chemical injection equipment
  • 65 GPM custom reverse osmosis treatment skid with full automation
  • Permeate, concentrate, and blend lines
  • Tie-in to existing well field transmission lines to include system bypass valving
  • SCADA controls & integration services with dedicated signal wire conduit system
  • Startup, testing, and operation of all equipment
Explore

Spaceport Reverse Osmosis Treatment Plant

Customer: NM Spaceport Authority
Design Engineer: PureOps
Location: Spaceport America Aerospace Facility — Truth or Consequences, NM
Date: October-December 2024
PureOps Price: $1.2M

PureOps builds a reverse osmosis water treatment facility from the ground up for Spaceport America, completing the most extensive project to-date for PureOps.

Scope of Work:

Coordinate engineering and construction services of 30’ x 60’ CMU building to include foundation prep, concrete slab, roll-up door, electrical, HVAC, custom
roofing system, and related site work to house water treatment equipment; design, size, build, and install reverse osmosis membrane skid (complete with controls, water softener, staging tank, booster pumps, control valves, chemical injection, and CIP systems)

Scope of Supply:

  • Complete turn-key engineering services by stamped NM P.E.
  • Foundation, rebar work and 3,000 PSI concrete pad
  • CMU Block to match existing infrastructure
  • Custom roofing system, garage door, and personnel door
  • 200A electrical service to building to include interior panels, disconnects, lighting, and 480V service to Reverse Osmosis Skid
  • Dual split system HVAC building climate control
  • 5,000 gallon staging tank inside of building
  • Booster pumps, water softener, pre filtration, and chemical injection equipment
  • 65 GPM custom reverse osmosis treatment skid with full automation
  • Permeate, concentrate, and blend lines
  • Tie-in to existing well field transmission lines to include system bypass valving
  • SCADA controls & integration services with dedicated signal wire conduit system
  • Startup, testing, and operation of all equipment

Spaceport Reverse Osmosis Treatment Plant

Truth or Consequences, NM

NMSU Transfer Pump Station Improvements

Customer: New Mexico State University
Location: Las Cruces, NM
Date: January 2025

PureOps gives the NMSU Transfer Pump Station a “facelift” including cleaning, new paint, and other aesthetic improvements.

Scope of Work:

Remove old paint from floors and piping; prep pumps and piping for new paint; clean room; paint pumps and piping.

Scope of Supply:

  • New primer and paint
  • Misc. tools & materials
Explore

NMSU Transfer Pump Station Improvements

Customer: New Mexico State University
Location: Las Cruces, NM
Date: January 2025

PureOps gives the NMSU Transfer Pump Station a “facelift” including cleaning, new paint, and other aesthetic improvements.

Scope of Work:

Remove old paint from floors and piping; prep pumps and piping for new paint; clean room; paint pumps and piping.

Scope of Supply:

  • New primer and paint
  • Misc. tools & materials

NMSU Transfer Pump Station Improvements

Las Cruces, NM

Resort Cl2 Installation

Customer: West Texas Resort
Design Engineer: PureOps
Location: West Texas
Date: August 2024
PureOps Price: $53,500

PureOps installs a complete chlorination system at a resort located in West Texas.

Scope of Work:

PureOps removes old chlorine gas system to include electrical, plumbing, and existing scales; conducts site preparations which includes removal of old mounting panels and hardware; installs new chlorine gas feed equipment, scales, booster pump, and safety shut off system; conducts full startup and training services for the customer; and leaves the site with the new system in working order

Scope of Supply:

  • (4) Hydro Instruments Series 900 Automatic Switchover Vacuum Regulator with Slide Bar Yoke
  • (2) Hydro Instruments Vertical In-Line Check Valve
  • (2) Hydro Instruments Chlorine Ejector, #2 Nozzle w/ Mounting Bracket
  • (2) Hydro Instruments Remote Meter Panel for Chlorine Gas, 6" Tube
  • (2) Hydro Instruments 1” Water Inlet Assembly w/ Y-strainer, PSI Pressure Gauge and True-Union Ball Valve
  • (2) Hydro Instruments Diaphragm Protected Pressure Gauge w/2.5" Dial
  • (1) Grundfos CR 3-9 Booster Pump, ANSI Flange Connections, Includes Companion Flanges
  • (1) Hydro Instruments Chlorine Gas Detector, Dual Sensor w/ Battery Backup
  • (2) Force Flow Dual Electronic Cylinder Scale w/ Solo G2 Weight Indicator
  • (1) SCOTT Industrial SCBA System, 2216 PSI
  • (2) Halogen Terminator Actuators & Control Panels for 150 lb Cylinders
  • (1) Gemini Control Panel w/ (2) Gravity Mount Terminator Actuators with 6 ft. Cables
  • (1) Misc. Parts
Explore

Resort Cl2 Installation

Customer: West Texas Resort
Design Engineer: PureOps
Location: West Texas
Date: August 2024
PureOps Price: $53,500

PureOps installs a complete chlorination system at a resort located in West Texas.

Scope of Work:

PureOps removes old chlorine gas system to include electrical, plumbing, and existing scales; conducts site preparations which includes removal of old mounting panels and hardware; installs new chlorine gas feed equipment, scales, booster pump, and safety shut off system; conducts full startup and training services for the customer; and leaves the site with the new system in working order

Scope of Supply:

  • (4) Hydro Instruments Series 900 Automatic Switchover Vacuum Regulator with Slide Bar Yoke
  • (2) Hydro Instruments Vertical In-Line Check Valve
  • (2) Hydro Instruments Chlorine Ejector, #2 Nozzle w/ Mounting Bracket
  • (2) Hydro Instruments Remote Meter Panel for Chlorine Gas, 6" Tube
  • (2) Hydro Instruments 1” Water Inlet Assembly w/ Y-strainer, PSI Pressure Gauge and True-Union Ball Valve
  • (2) Hydro Instruments Diaphragm Protected Pressure Gauge w/2.5" Dial
  • (1) Grundfos CR 3-9 Booster Pump, ANSI Flange Connections, Includes Companion Flanges
  • (1) Hydro Instruments Chlorine Gas Detector, Dual Sensor w/ Battery Backup
  • (2) Force Flow Dual Electronic Cylinder Scale w/ Solo G2 Weight Indicator
  • (1) SCOTT Industrial SCBA System, 2216 PSI
  • (2) Halogen Terminator Actuators & Control Panels for 150 lb Cylinders
  • (1) Gemini Control Panel w/ (2) Gravity Mount Terminator Actuators with 6 ft. Cables
  • (1) Misc. Parts

Resort Cl2 Installation

West Texas

Chlorine Scrubber Replacement Project

Customer: El Paso Water Utilities
Design Engineer: Freese and Nichols
Location: El Paso, TX
Date: September 2023
PureOps Price: $360,000

PureOps assists Smithco Construction with the engineering and replacement of an existing wet scrubber with a new Dry Scrubber from Purafil (AOC1), including necessary FRP ducting and chlorine gas sensors.

Scope of Work:

Replace old wet scrubber with the new Purafil AOC1 dry scrubber; assist with installation of the FRP ducting; perform startup and training for the end user

Scope of Supply:

  • (1) Purafil AOC1 Dry Scrubber for Chlorine Gas
  • (1) FRP Ducting for new scrubber, including actuated damper, fittings, and glass kits
  • (1) Set of Sensidyne chlorine gas detectors for the chlorine storage area and stack alarm sensor
Explore

Chlorine Scrubber Replacement Project

Customer: El Paso Water Utilities
Design Engineer: Freese and Nichols
Location: El Paso, TX
Date: September 2023
PureOps Price: $360,000

PureOps assists Smithco Construction with the engineering and replacement of an existing wet scrubber with a new Dry Scrubber from Purafil (AOC1), including necessary FRP ducting and chlorine gas sensors.

Scope of Work:

Replace old wet scrubber with the new Purafil AOC1 dry scrubber; assist with installation of the FRP ducting; perform startup and training for the end user

Scope of Supply:

  • (1) Purafil AOC1 Dry Scrubber for Chlorine Gas
  • (1) FRP Ducting for new scrubber, including actuated damper, fittings, and glass kits
  • (1) Set of Sensidyne chlorine gas detectors for the chlorine storage area and stack alarm sensor

Chlorine Scrubber Replacement Project

El Paso, TX

Complete Chlorination System Replacement and Upgrade

Customer: City of Tolleson
Design Engineer: PureOps
Location: Tolleson, AZ
Date: November 2024
PureOps Price: $77,000

PureOps removes and replaces the entire one-ton chlorine gas feed system for the Tolleson WWTP.

Scope of Work:

Coordinate with Tolleson WWTP staff to temporarily inject Sodium Hypochlorite (NaOCl) for disinfection of wastewater during the removal and replacement of current chlorine gas injection system; Remove all obsolete and aged chlorine gas injection equipment including ejectors, vacuum regulators, pacing valves, related plumbing; Install all new equipment and add a safety shutoff system from Halogen to give the operations team an added layer of safety when working with chlorine gas; Replace all of the PVC chlorine gas vacuum lines as well as the chlorine solution manifold by request of the WWTP supervisor while onsite, as the piping was brittle and compromised; Upon complete installation, perform a full startup, testing, and operator training in order to get the plant back online safely; PureOps and the Tolleson team planned to inject temporary Sodium Hypochlorite (NaOCl) for an entire week, however, the service team worked through the night to get the WWTP back online with chlorine gas in 48 hours.

Scope of Supply:

  • (2) Hydro Instruments 2" Chlorine Gas Ejector, Variable Orifice, 2,000 PPD Max
  • (2) Hydro Instruments Secondary Check Valve for Chlorine Ejectors
  • (4) Hydro Instruments Series 300 Ton Mount Vacuum Regulator for Chlorine Gas, 0-500 PPD
  • (1) Hydro Instruments GA-180 Chlorine Gas Detector, 4 Sensors
  • (1) Hydro Instruments Pacing Valve for Chlorine Gas, 1" NPT Bypass Plumbing, 12" Remote Meter Panel 2,000 PPD & 120V Vacuum Monitor (0-30" Hg)
  • (1) Halogen Valve Systems Hexacon - III Emergency Shutoff Actuator System for Three (3) One-Ton Chlorine Containers.
  • (3) Wall mount Storage Brackets for Actuators
  • (2) Remote Emergency Shutoff Switch (Panic Buttons) for Exit Doors Spare Equipment, Sensors, and Parts Needed for Future Repairs and Troubleshooting
  • Operation & Maintenance Manuals on All Equipment
Explore

Complete Chlorination System Replacement and Upgrade

Customer: City of Tolleson
Design Engineer: PureOps
Location: Tolleson, AZ
Date: November 2024
PureOps Price: $77,000

PureOps removes and replaces the entire one-ton chlorine gas feed system for the Tolleson WWTP.

Scope of Work:

Coordinate with Tolleson WWTP staff to temporarily inject Sodium Hypochlorite (NaOCl) for disinfection of wastewater during the removal and replacement of current chlorine gas injection system; Remove all obsolete and aged chlorine gas injection equipment including ejectors, vacuum regulators, pacing valves, related plumbing; Install all new equipment and add a safety shutoff system from Halogen to give the operations team an added layer of safety when working with chlorine gas; Replace all of the PVC chlorine gas vacuum lines as well as the chlorine solution manifold by request of the WWTP supervisor while onsite, as the piping was brittle and compromised; Upon complete installation, perform a full startup, testing, and operator training in order to get the plant back online safely; PureOps and the Tolleson team planned to inject temporary Sodium Hypochlorite (NaOCl) for an entire week, however, the service team worked through the night to get the WWTP back online with chlorine gas in 48 hours.

Scope of Supply:

  • (2) Hydro Instruments 2" Chlorine Gas Ejector, Variable Orifice, 2,000 PPD Max
  • (2) Hydro Instruments Secondary Check Valve for Chlorine Ejectors
  • (4) Hydro Instruments Series 300 Ton Mount Vacuum Regulator for Chlorine Gas, 0-500 PPD
  • (1) Hydro Instruments GA-180 Chlorine Gas Detector, 4 Sensors
  • (1) Hydro Instruments Pacing Valve for Chlorine Gas, 1" NPT Bypass Plumbing, 12" Remote Meter Panel 2,000 PPD & 120V Vacuum Monitor (0-30" Hg)
  • (1) Halogen Valve Systems Hexacon - III Emergency Shutoff Actuator System for Three (3) One-Ton Chlorine Containers.
  • (3) Wall mount Storage Brackets for Actuators
  • (2) Remote Emergency Shutoff Switch (Panic Buttons) for Exit Doors Spare Equipment, Sensors, and Parts Needed for Future Repairs and Troubleshooting
  • Operation & Maintenance Manuals on All Equipment

Complete Chlorination System Replacement and Upgrade

Tolleson, AZ

Cla-Val Training

Location: Costa Mesa, CA
Date: October 2024

PureOps travels to Southern California to participate in the Cal-Val 101/201 training at their 20+ acre headquarters.

Scope of Work:

PureOps-ers Brandon and Miguel undertook a three-day, mixed-format training at Cla-Val University, including formal instruction, hands-on training, and a complete factory tour. The coursework covered the fundamentals of control valves as well as a deep dive into solenoid-operated valves, altitude valves, multi-pilot control valves, and new technologies being developed by Cal-Val.

Additional Info:

Since 1936, Cla-Val has been known as the leading manufacturer of automatic control valves and has built a well-earned reputation for providing superior quality products designed for mission-critical water distribution solutions throughout the United States and around the world. Cla-Val moved to its present home and worldwide headquarters in Costa Mesa, California in 1954. Today, they are the only valve manufacturer in the world with two in-house foundries.

Explore

Cla-Val Training

Location: Costa Mesa, CA
Date: October 2024

PureOps travels to Southern California to participate in the Cal-Val 101/201 training at their 20+ acre headquarters.

Scope of Work:

PureOps-ers Brandon and Miguel undertook a three-day, mixed-format training at Cla-Val University, including formal instruction, hands-on training, and a complete factory tour. The coursework covered the fundamentals of control valves as well as a deep dive into solenoid-operated valves, altitude valves, multi-pilot control valves, and new technologies being developed by Cal-Val.

Additional Info:

Since 1936, Cla-Val has been known as the leading manufacturer of automatic control valves and has built a well-earned reputation for providing superior quality products designed for mission-critical water distribution solutions throughout the United States and around the world. Cla-Val moved to its present home and worldwide headquarters in Costa Mesa, California in 1954. Today, they are the only valve manufacturer in the world with two in-house foundries.

Cla-Val Training

Costa Mesa, CA

Glendale Aquatics Vacuum Regulator Replacement

Customer: Glendale Aquatics
Location: Glendale, AZ
Date: May 2024
PureOps Price: $15,000

PureOps replaces (6) old Regal Vacuum Regulators with new Regal units for an aquatics center in Glendale, AZ. PureOps also supplied the customer with additional Regal Vacuum Regulators for another pool site and shelf spares.

Scope of Work:

Remove old vacuum regulators and vacuum tubing; install new vacuum regulators and vacuum tubing with appropriate fittings; and provide training to on-site staff covering the proper safety and operation practices of chlorine gas injection systems

Scope of Supply:

(10) Regal Model A-826 Vacuum Regulators, assorted vacuum tubing fittings, and
roughly 300’ of vacuum tubing

Explore

Glendale Aquatics Vacuum Regulator Replacement

Customer: Glendale Aquatics
Location: Glendale, AZ
Date: May 2024
PureOps Price: $15,000

PureOps replaces (6) old Regal Vacuum Regulators with new Regal units for an aquatics center in Glendale, AZ. PureOps also supplied the customer with additional Regal Vacuum Regulators for another pool site and shelf spares.

Scope of Work:

Remove old vacuum regulators and vacuum tubing; install new vacuum regulators and vacuum tubing with appropriate fittings; and provide training to on-site staff covering the proper safety and operation practices of chlorine gas injection systems

Scope of Supply:

(10) Regal Model A-826 Vacuum Regulators, assorted vacuum tubing fittings, and
roughly 300’ of vacuum tubing

Glendale Aquatics Vacuum Regulator Replacement

Glendale, AZ

U.S. Army Yuma Proving Grounds (YPG) Chlorination System

Customer: U.S. Army Yuma Proving Grounds
Design Engineer: PureOps
Location: Yuma, AZ
Date: July 2024
PureOps Price: $39,000

PureOps travels to Yuma to install a new chlorine gas system at a WTP in Yuma, AZ.

Scope of Work:

Remove existing Wallace & Tiernan chlorine gas injection system; replace it with a
new dual-injection point Regal chlorine gas system inside of a 6’ x 6’ FRP building;
replace the existing scale system with a new electronic load cell system from
Force Flow; install new chlorine analyzers from Hydro Instruments.

Scope of Supply:

  • (1) Regal 216 Complete Chlorine Gas Switchover System, Configured for 10 PPD and 2 Injection Points
  • (2) Regal SmartValve for Residual Pacing, 0-10 PPD, 120V
  • (1) Regal Single Sensor Gas Detector, 0-10 PPM, 120V W/ Battery Backup
  • (2) Hydro Instruments Corp Stop Diffuser, 1" CPVC w/ Brass Ball Valve
  • (1) Force Flow Dual Cylinder Scale w/ SOLO G2 Indicator
  • (2) Hydro Instruments RPH-250 Free Chlorine Residual Analyzer, 0-2 PPM Self-Cleaning Head, Includes Pressure Reducing Valve and Pressure Gauge
Explore

U.S. Army Yuma Proving Grounds (YPG) Chlorination System

Customer: U.S. Army Yuma Proving Grounds
Design Engineer: PureOps
Location: Yuma, AZ
Date: July 2024
PureOps Price: $39,000

PureOps travels to Yuma to install a new chlorine gas system at a WTP in Yuma, AZ.

Scope of Work:

Remove existing Wallace & Tiernan chlorine gas injection system; replace it with a
new dual-injection point Regal chlorine gas system inside of a 6’ x 6’ FRP building;
replace the existing scale system with a new electronic load cell system from
Force Flow; install new chlorine analyzers from Hydro Instruments.

Scope of Supply:

  • (1) Regal 216 Complete Chlorine Gas Switchover System, Configured for 10 PPD and 2 Injection Points
  • (2) Regal SmartValve for Residual Pacing, 0-10 PPD, 120V
  • (1) Regal Single Sensor Gas Detector, 0-10 PPM, 120V W/ Battery Backup
  • (2) Hydro Instruments Corp Stop Diffuser, 1" CPVC w/ Brass Ball Valve
  • (1) Force Flow Dual Cylinder Scale w/ SOLO G2 Indicator
  • (2) Hydro Instruments RPH-250 Free Chlorine Residual Analyzer, 0-2 PPM Self-Cleaning Head, Includes Pressure Reducing Valve and Pressure Gauge

U.S. Army Yuma Proving Grounds (YPG) Chlorination System

Yuma, AZ

El Paso Water WTP Chlorination System Service & Training

Customer: El Paso Water Utilities
Location: El Paso, TX
Date: February 2023

PureOps assists factory technical support in the service and training of the entire chlorination system at a WTP in El Paso, TX. Utility staff was trained on disassembly, cleaning, and re-assembly of all chlorine gas feed equipment and components.

Explore

El Paso Water WTP Chlorination System Service & Training

Customer: El Paso Water Utilities
Location: El Paso, TX
Date: February 2023

PureOps assists factory technical support in the service and training of the entire chlorination system at a WTP in El Paso, TX. Utility staff was trained on disassembly, cleaning, and re-assembly of all chlorine gas feed equipment and components.

El Paso Water WTP Chlorination System Service & Training

El Paso, TX

Taos Pueblo PRV Replacement Project

Customer: Taos Pueblo Utility Services
Location: Taos Pueblo, NM
Date: May 2023
PureOps Price: $23,000

PureOps designs, supplies, and installs new 1.5” and 2” PRVs (Pressure Reducing Valves) for the Taos Pueblo to replace old failing infrastructure.

Scope of Work:

Remove and replace existing 1.5” and 2” Cla-Val PRVs; convert old leaking plumbing from galvanized steel to copper pipe.

Scope of Supply:

  • (1) Cla-Val 1.5” PRV with Stainless Steel Trim and Pilot Assembly
  • (1) Cla-Val 2” PRV with Stainless Steel Trim and Pilot Assembly
  • (1) Copper Pipe, Fittings, Pro Press tool, and other miscellaneous equipment
Explore

Taos Pueblo PRV Replacement Project

Customer: Taos Pueblo Utility Services
Location: Taos Pueblo, NM
Date: May 2023
PureOps Price: $23,000

PureOps designs, supplies, and installs new 1.5” and 2” PRVs (Pressure Reducing Valves) for the Taos Pueblo to replace old failing infrastructure.

Scope of Work:

Remove and replace existing 1.5” and 2” Cla-Val PRVs; convert old leaking plumbing from galvanized steel to copper pipe.

Scope of Supply:

  • (1) Cla-Val 1.5” PRV with Stainless Steel Trim and Pilot Assembly
  • (1) Cla-Val 2” PRV with Stainless Steel Trim and Pilot Assembly
  • (1) Copper Pipe, Fittings, Pro Press tool, and other miscellaneous equipment

Taos Pueblo PRV Replacement Project

Taos Pueblo, NM

El Paso Water WWTP Halogen Safety Shutoff Actuator Installation

Customer: El Paso Water Utilities
Location: El Paso, TX
Date: May 2022
PureOps Price: $185,000

PureOps supplies and installs (4) 6-channel Halogen Safety Shutoff Actuator Systems at a WWTP in El Paso, TX. These actuators provide much needed safety at this facility being that there are 24 one-ton containers that may be online at any given time. The actuator controllers are tied into the chlorine gas detectors as well as emergency “panic” buttons located near the two exit doors. Regular maintenance on the Hydro Instruments Gas Detectors and Halogen Shutoff System is performed by PureOps.

Explore

El Paso Water WWTP Halogen Safety Shutoff Actuator Installation

Customer: El Paso Water Utilities
Location: El Paso, TX
Date: May 2022
PureOps Price: $185,000

PureOps supplies and installs (4) 6-channel Halogen Safety Shutoff Actuator Systems at a WWTP in El Paso, TX. These actuators provide much needed safety at this facility being that there are 24 one-ton containers that may be online at any given time. The actuator controllers are tied into the chlorine gas detectors as well as emergency “panic” buttons located near the two exit doors. Regular maintenance on the Hydro Instruments Gas Detectors and Halogen Shutoff System is performed by PureOps.

El Paso Water WWTP Halogen Safety Shutoff Actuator Installation

El Paso, TX

El Paso Water WWTP Ejector Replacement and Feed Equipment Service

Customer: El Paso Water Utilities
Design Engineer: PureOps
Location: El Paso, TX
Date: June 2023
PureOps Price: $23,500

PureOps designs, supplies, and installs new 3” Hydro Instruments 10,000 PPD Chlorine Ejectors and services existing pacing valve floor cabinets without disrupting plant operations or chlorine injection.

Scope of Work:

Remove and replace existing 3” high capacity chlorine ejectors and related plumbing, install new 1” drain valves and 3” isolation valves, service high capacity pacing valve floor cabinets and related accessories (differential pressure regulators, vacuum trim valves, remote metering tubes). Conducted pressure and vacuum testing on all equipment and re-commissioned system.

Scope of Supply:

  • (2) Hydro Instruments 10,000 PPD 3” Variable Orifice Chlorine Ejectors
  • (2) Hydro Instruments 1” Drain Valves
  • (2) Hydro Instruments PM Kits for OV-1000 Floor Cabinet Pacing Valves
  • (2) Hydro Instruments PM Kits for Differential Pressure Regulators
  • (2) Hydro Instruments PM Kits for Vacuum Trim Valves
  • (20) Hydro Instruments IV-830 Isolation Valve Assemblies for Ton Containers
  • (1) Miscellaneous plumbing parts, special tools, and ancillary equipment to complete project
Explore

El Paso Water WWTP Ejector Replacement and Feed Equipment Service

Customer: El Paso Water Utilities
Design Engineer: PureOps
Location: El Paso, TX
Date: June 2023
PureOps Price: $23,500

PureOps designs, supplies, and installs new 3” Hydro Instruments 10,000 PPD Chlorine Ejectors and services existing pacing valve floor cabinets without disrupting plant operations or chlorine injection.

Scope of Work:

Remove and replace existing 3” high capacity chlorine ejectors and related plumbing, install new 1” drain valves and 3” isolation valves, service high capacity pacing valve floor cabinets and related accessories (differential pressure regulators, vacuum trim valves, remote metering tubes). Conducted pressure and vacuum testing on all equipment and re-commissioned system.

Scope of Supply:

  • (2) Hydro Instruments 10,000 PPD 3” Variable Orifice Chlorine Ejectors
  • (2) Hydro Instruments 1” Drain Valves
  • (2) Hydro Instruments PM Kits for OV-1000 Floor Cabinet Pacing Valves
  • (2) Hydro Instruments PM Kits for Differential Pressure Regulators
  • (2) Hydro Instruments PM Kits for Vacuum Trim Valves
  • (20) Hydro Instruments IV-830 Isolation Valve Assemblies for Ton Containers
  • (1) Miscellaneous plumbing parts, special tools, and ancillary equipment to complete project

El Paso Water WWTP Ejector Replacement and Feed Equipment Service

El Paso, TX

Portales Chlorine Pacing Valve Replacement

Customer: Portales, NM (Wastewater Treatment Plant)
Design Engineer: PureOps
Location: Portales, NM
Date: April 2023
PureOps Price: $10,000

PureOps designs, supplies, and installs new pacing valve, ejector, and piping for the City of Portales Wastewater Treatment Plant.

Scope of Work:

Remove and Replace existing Chlorine Pacing Valve, Ejector, Piping, and Accessories. Provide Training to staff on operation of system.

Scope of Supply:

  • (1) Hydro Instruments 250 PPD Pacing Valve with 6” Remote Meter Panel
  • (1) Hydro Instruments 250 PPD Ejector
  • (1) Hydro Instruments Vertical In-Line Check Valve
  • (4) Horizon 100-lb Bucket of Calcium Hypochlorite Granules for temporary disinfection during replacement work
Explore

Portales Chlorine Pacing Valve Replacement

Customer: Portales, NM (Wastewater Treatment Plant)
Design Engineer: PureOps
Location: Portales, NM
Date: April 2023
PureOps Price: $10,000

PureOps designs, supplies, and installs new pacing valve, ejector, and piping for the City of Portales Wastewater Treatment Plant.

Scope of Work:

Remove and Replace existing Chlorine Pacing Valve, Ejector, Piping, and Accessories. Provide Training to staff on operation of system.

Scope of Supply:

  • (1) Hydro Instruments 250 PPD Pacing Valve with 6” Remote Meter Panel
  • (1) Hydro Instruments 250 PPD Ejector
  • (1) Hydro Instruments Vertical In-Line Check Valve
  • (4) Horizon 100-lb Bucket of Calcium Hypochlorite Granules for temporary disinfection during replacement work

Portales Chlorine Pacing Valve Replacement

Portales, NM

El Paso Water WTP Scrubber Replacement Project

Customer: El Paso Water Utilities
Design Engineer: PureOps & H2O Terra
Location: El Paso, TX
Date: April 2022
PureOps Price: $360,000

PureOps supplies and assists with the design, supply, and installation of a replacement Dry Scrubber System to replace the existing failed wet scrubber system. The new dry scrubber was designed to handle both Chlorine (Cl2) and Sulphur Dioxide (SO2) gasses in one-ton containers, utilizing the Purafil proprietary dry media Chlorsorb Ultra.

Scope of Work:

System design and sizing for replacement scrubber system; remove wet scrubber; prep concrete foundation and FRP ducting for new dry scrubber; install new FRP ducting and motorized dampers; install new scrubber vessel and load media via crane; remove and replace existing gas detection equipment; integration of controls and alarms to plant SCADA system; complete startup & training of operations staff.

Scope of Supply:

  • System Design, Capacity Sizing, and Various Application Engineering By PureOps
  • Purafil AOC1 Aluminum Vessel Horizontal Flow Dry Scrubber Vessel, 18” Diameter Inlet and 24” Diameter Outlet Connections. Includes Sample Ports and Media Bed Baffle Walls
  • (19,440 lbs) Chlorsorb Ultra Dry Media
  • 5,000 CFM 40HP Blower, NYB Model 24 FE-HP
  • Scrubber Control Panel
  • (1) 5-ft Aluminum Exhaust Stack w/Rain Hood and Bird Screen
  • Dwyer Megnehelic Differential Pressure Gauge and Pressure Switch
  • 18” Actuating FRP Dampers for Zone Control
  • Sensidyne Dual Channel SensAlarm FLEX Gas Detection Systems (One for Cl2 and One for SO2)
  • Miscellaneous Parts, Equipment, Tooling and Materials for Installation
Explore

El Paso Water WTP Scrubber Replacement Project

Customer: El Paso Water Utilities
Design Engineer: PureOps & H2O Terra
Location: El Paso, TX
Date: April 2022
PureOps Price: $360,000

PureOps supplies and assists with the design, supply, and installation of a replacement Dry Scrubber System to replace the existing failed wet scrubber system. The new dry scrubber was designed to handle both Chlorine (Cl2) and Sulphur Dioxide (SO2) gasses in one-ton containers, utilizing the Purafil proprietary dry media Chlorsorb Ultra.

Scope of Work:

System design and sizing for replacement scrubber system; remove wet scrubber; prep concrete foundation and FRP ducting for new dry scrubber; install new FRP ducting and motorized dampers; install new scrubber vessel and load media via crane; remove and replace existing gas detection equipment; integration of controls and alarms to plant SCADA system; complete startup & training of operations staff.

Scope of Supply:

  • System Design, Capacity Sizing, and Various Application Engineering By PureOps
  • Purafil AOC1 Aluminum Vessel Horizontal Flow Dry Scrubber Vessel, 18” Diameter Inlet and 24” Diameter Outlet Connections. Includes Sample Ports and Media Bed Baffle Walls
  • (19,440 lbs) Chlorsorb Ultra Dry Media
  • 5,000 CFM 40HP Blower, NYB Model 24 FE-HP
  • Scrubber Control Panel
  • (1) 5-ft Aluminum Exhaust Stack w/Rain Hood and Bird Screen
  • Dwyer Megnehelic Differential Pressure Gauge and Pressure Switch
  • 18” Actuating FRP Dampers for Zone Control
  • Sensidyne Dual Channel SensAlarm FLEX Gas Detection Systems (One for Cl2 and One for SO2)
  • Miscellaneous Parts, Equipment, Tooling and Materials for Installation

El Paso Water WTP Scrubber Replacement Project

El Paso, TX

Lower Rio Grande Water Treatment

Customer: Lower Rio Grande PWWA
Design Engineer: Bohannan Houston, Inc.
Location: Doña Ana County, NM
Date: Winter 2022-2023
PureOps Price: $135,000

PureOps installs chlorination system at arsenic removal plant for Lower Rio Grande PWWA, supplying and installing the following equipment.

Supply and Installation of Equipment:

  • (1)Grundfos Duplex Dosing Skid for Ferric Chloride

  • (1) Grundfos Duplex Dosing Skid for Sulfuric Acid

  • (1) Grundfos Duplex Dosing Skid for Caustic Soda

  • (3) Force Flow Model 50-DR50TB Platforms

  • (3) Force Flow Model 4000-1 Indicators

  • (1) Regal Complete Switchover System for Chlorine Gas

    Direct Cylinder Mounted Vacuum Operated Switchover

    P/N: 216

  • (1) Regal Single Sensor Chlorine Gas Detector, 0-10 PPM, 25' Standard Cable, w/ Battery Back-Up

    P/N: 3001, 3063

  • (1) Force Flow Dual Cylinder Electronic Scale System

    P/N: WR150-2

  • (1) Grundfos Vertical Booster Pump, CR3-6, Includes Companion Flanges

    P/N: CR3-6, 460/3/60

  • (1) SCOTT SCBA, Includes Face Mask and Cylinder

    P/N: IND112AA3104121

  • (1) Indian Springs Chlorine Cylinder Repair Kit "A"

    P/N: C-376A

  • (1) Halogen Valve Systems Dual Terminator Emergency Shutoff System

    Includes:

    Gemini Control Panel w/ (2) Gravity Mount Terminator Actuators with 6 ft. Cables, Relay Interface Module

    P/N: 8002.14

  • Miscellaneous equipment, parts, and supplies – including spare equipment, repair kits, etc.

Explore

Lower Rio Grande Water Treatment

Customer: Lower Rio Grande PWWA
Design Engineer: Bohannan Houston, Inc.
Location: Doña Ana County, NM
Date: Winter 2022-2023
PureOps Price: $135,000

PureOps installs chlorination system at arsenic removal plant for Lower Rio Grande PWWA, supplying and installing the following equipment.

Supply and Installation of Equipment:

  • (1)Grundfos Duplex Dosing Skid for Ferric Chloride

  • (1) Grundfos Duplex Dosing Skid for Sulfuric Acid

  • (1) Grundfos Duplex Dosing Skid for Caustic Soda

  • (3) Force Flow Model 50-DR50TB Platforms

  • (3) Force Flow Model 4000-1 Indicators

  • (1) Regal Complete Switchover System for Chlorine Gas

    Direct Cylinder Mounted Vacuum Operated Switchover

    P/N: 216

  • (1) Regal Single Sensor Chlorine Gas Detector, 0-10 PPM, 25' Standard Cable, w/ Battery Back-Up

    P/N: 3001, 3063

  • (1) Force Flow Dual Cylinder Electronic Scale System

    P/N: WR150-2

  • (1) Grundfos Vertical Booster Pump, CR3-6, Includes Companion Flanges

    P/N: CR3-6, 460/3/60

  • (1) SCOTT SCBA, Includes Face Mask and Cylinder

    P/N: IND112AA3104121

  • (1) Indian Springs Chlorine Cylinder Repair Kit "A"

    P/N: C-376A

  • (1) Halogen Valve Systems Dual Terminator Emergency Shutoff System

    Includes:

    Gemini Control Panel w/ (2) Gravity Mount Terminator Actuators with 6 ft. Cables, Relay Interface Module

    P/N: 8002.14

  • Miscellaneous equipment, parts, and supplies – including spare equipment, repair kits, etc.

Lower Rio Grande Water Treatment

Doña Ana County, NM

El Centro Meter Installation

Customer: Lower Rio Grande PWWA
Location: Doña Ana County, NM
Date: March 2023

PureOps installs ABB mag meter for Lower Rio Grande PWWA.

Explore

El Centro Meter Installation

Customer: Lower Rio Grande PWWA
Location: Doña Ana County, NM
Date: March 2023

PureOps installs ABB mag meter for Lower Rio Grande PWWA.

El Centro Meter Installation

Doña Ana County, NM

El Paso Water WWTP Chlorine Evaporator and Floor Cabinet Replacement

Customer: El Paso Water
Design Engineer: System Designed by PureOps & Hydro Instruments
Location: El Paso, TX
Date: August 2022
PureOps Price: $205,000

PureOps designs, supplies, and builds replacement Evaporator Systems, High Capacity Vacuum Regulators, Inlet Filters, Pressure Reducing Valves, Floor Cabinet Pacing Valves, and High Capacity Chlorine Ejectors for WWTP in El Paso, TX.

Scope of Work:

  • Removal and Replacement of Two (2) Existing Evaporators
  • Removal and Replacement of Two (2) Existing Chlorinators
  • Removal and Replacement of Two (2) Existing Pressure Reducing Valves
  • Removal and Replacement of Two (2) Existing Pressure Relief Valve Assemblies
  • Removal and Replacement of Two (2) Existing Expansion Chambers
  • Removal and Replacement of Two (2) Existing 3" Ejectors and One (1) 2" Ejector
  • Factory Representative Startup, Training, and Support

Scope of Supply:

  • (2) Hydro Instruments VPH-10000-1 Vaporizer (10,000 PPD Cl2)
  • (2) Hydro Instruments PRV-71H Electrically Actuated Pressure Reducing Valve (12,000 PPD Cl2)
  • (2) Hydro Instruments Expansion Chamber Assembly
  • (2) Hydro Instruments Series FH-1000 Floor Cabinet (4,000 PPD Cl2)
  • (1) Hydro Instruments Model EJH-2000-CL2-2 Ejector, 2" Flanged with Check Valve 1 And 500/750 Nozzle/Throat Selection, 1" inlet
  • (2) Hydro Instruments Model EJH-3200-CL2-4 Enhanced Performance 3" Ejector 2 With Check Valve, Drain Valve And 1.078/1.593 Nozzle/Throat
Explore

El Paso Water WWTP Chlorine Evaporator and Floor Cabinet Replacement

Customer: El Paso Water
Design Engineer: System Designed by PureOps & Hydro Instruments
Location: El Paso, TX
Date: August 2022
PureOps Price: $205,000

PureOps designs, supplies, and builds replacement Evaporator Systems, High Capacity Vacuum Regulators, Inlet Filters, Pressure Reducing Valves, Floor Cabinet Pacing Valves, and High Capacity Chlorine Ejectors for WWTP in El Paso, TX.

Scope of Work:

  • Removal and Replacement of Two (2) Existing Evaporators
  • Removal and Replacement of Two (2) Existing Chlorinators
  • Removal and Replacement of Two (2) Existing Pressure Reducing Valves
  • Removal and Replacement of Two (2) Existing Pressure Relief Valve Assemblies
  • Removal and Replacement of Two (2) Existing Expansion Chambers
  • Removal and Replacement of Two (2) Existing 3" Ejectors and One (1) 2" Ejector
  • Factory Representative Startup, Training, and Support

Scope of Supply:

  • (2) Hydro Instruments VPH-10000-1 Vaporizer (10,000 PPD Cl2)
  • (2) Hydro Instruments PRV-71H Electrically Actuated Pressure Reducing Valve (12,000 PPD Cl2)
  • (2) Hydro Instruments Expansion Chamber Assembly
  • (2) Hydro Instruments Series FH-1000 Floor Cabinet (4,000 PPD Cl2)
  • (1) Hydro Instruments Model EJH-2000-CL2-2 Ejector, 2" Flanged with Check Valve 1 And 500/750 Nozzle/Throat Selection, 1" inlet
  • (2) Hydro Instruments Model EJH-3200-CL2-4 Enhanced Performance 3" Ejector 2 With Check Valve, Drain Valve And 1.078/1.593 Nozzle/Throat

El Paso Water WWTP Chlorine Evaporator and Floor Cabinet Replacement

El Paso, TX

Tornillo Meter Installation

Customer: El Paso County Tornillo WID
Location: Tornillo, TX
Date: Winter 2022-2023

PureOps installs Endress + Hauser mag meter for El Paso County Tornillo WID.

Explore

Tornillo Meter Installation

Customer: El Paso County Tornillo WID
Location: Tornillo, TX
Date: Winter 2022-2023

PureOps installs Endress + Hauser mag meter for El Paso County Tornillo WID.

Tornillo Meter Installation

Tornillo, TX

La Union Meter Installation

Customer: La Union MDWCA
Location: La Union, NM
Date: Winter 2022-2023

PureOps replaces meter for La Union MDWCA, installing Master Meter 6” Octave.

Explore

La Union Meter Installation

Customer: La Union MDWCA
Location: La Union, NM
Date: Winter 2022-2023

PureOps replaces meter for La Union MDWCA, installing Master Meter 6” Octave.

La Union Meter Installation

La Union, NM

Town of Pecos Meter Replacement

Customer: Town of Pecos
Location: Pecos, TX
Date: 2017-2018, multiple project phases over the course of 18 months
PureOps Price: $150,000

PureOps replaces 28 turbine meters ranging from 3” to 6” throughout the Town of Pecos production well field.

  • Mobilization/demobilization
  • Decommissioned existing meters
  • Installed meters and related plumbing including new spools of pipe and flange adapters
  • Installed electrical conduit from control panels to meter locations, as well as new power supply leads and connections
  • Installed overload relays and communication via 4-20 mA signal
  • Start-up and testing of all equipment, including hydrostatic testing of plumbing and mechanical joints
Explore

Town of Pecos Meter Replacement

Customer: Town of Pecos
Location: Pecos, TX
Date: 2017-2018, multiple project phases over the course of 18 months
PureOps Price: $150,000

PureOps replaces 28 turbine meters ranging from 3” to 6” throughout the Town of Pecos production well field.

  • Mobilization/demobilization
  • Decommissioned existing meters
  • Installed meters and related plumbing including new spools of pipe and flange adapters
  • Installed electrical conduit from control panels to meter locations, as well as new power supply leads and connections
  • Installed overload relays and communication via 4-20 mA signal
  • Start-up and testing of all equipment, including hydrostatic testing of plumbing and mechanical joints

Town of Pecos Meter Replacement

Pecos, TX

El Paso Water Chlorine Gas System

Customer: El Paso Water
Location: El Paso, TX
Date: 2018, one-week project
PureOps Price: $55,000

PureOps de-and-re-commissions major gas chlorine system (24 one-ton cylinders) for El Paso Water, supplying and installing Hydro Instruments vacuum regulators (16,000 PPD), ball valves, chlorine filters, gauges, pressure relief valves, and related accessories.

  • Decommissioned existing wall mount chlorine vacuum regulators and manifold plumbing, including chlorine filters, ball valves, gauges, pressure relief valves, and related accessories
  • Supplied and installed two sets of Hydro Instruments 8000 PPD wall mount vacuum regulators, ball valves, chlorine filters, gauges, pressure relief valves, and related accessories
  • Tested pressure and vacuum on all equipment
Explore

El Paso Water Chlorine Gas System

Customer: El Paso Water
Location: El Paso, TX
Date: 2018, one-week project
PureOps Price: $55,000

PureOps de-and-re-commissions major gas chlorine system (24 one-ton cylinders) for El Paso Water, supplying and installing Hydro Instruments vacuum regulators (16,000 PPD), ball valves, chlorine filters, gauges, pressure relief valves, and related accessories.

  • Decommissioned existing wall mount chlorine vacuum regulators and manifold plumbing, including chlorine filters, ball valves, gauges, pressure relief valves, and related accessories
  • Supplied and installed two sets of Hydro Instruments 8000 PPD wall mount vacuum regulators, ball valves, chlorine filters, gauges, pressure relief valves, and related accessories
  • Tested pressure and vacuum on all equipment

El Paso Water Chlorine Gas System

El Paso, TX

Picacho MDWCA Turnkey Production Well

Customer: Picacho MDWCA
Location: Las Cruces, NM
Date: 2012-2013, three-month project
Customer Estimated Cost: $240,000
PureOps Price: $110,000

PureOps completes first turnkey production well (300-gallon), with all the bells and whistles — and the well building to boot — serving the needs of Picacho MDWCA.

Supply and Installation of Equipment

  • Clamp-on ultrasonic flow meter
  • Polyphosphate injection system
  • Chlorine gas injection system, including chlorine scales, automatic shut off actuators, gas detection equipment, injection booster pump, and chlorine residual analyzer
  • Motor controls and all related electrical and SCADA equipment

Construction of 24’ x 13’ Well House

  • Cement pad and foundation
  • Tie-in newly drilled well to the distribution system
  • Installation of 6” pump control and diaphragm check valves
  • Discharge basin and pond area
  • Construction of gravel access road
Explore

Picacho MDWCA Turnkey Production Well

Customer: Picacho MDWCA
Location: Las Cruces, NM
Date: 2012-2013, three-month project
Customer Estimated Cost: $240,000
PureOps Price: $110,000

PureOps completes first turnkey production well (300-gallon), with all the bells and whistles — and the well building to boot — serving the needs of Picacho MDWCA.

Supply and Installation of Equipment

  • Clamp-on ultrasonic flow meter
  • Polyphosphate injection system
  • Chlorine gas injection system, including chlorine scales, automatic shut off actuators, gas detection equipment, injection booster pump, and chlorine residual analyzer
  • Motor controls and all related electrical and SCADA equipment

Construction of 24’ x 13’ Well House

  • Cement pad and foundation
  • Tie-in newly drilled well to the distribution system
  • Installation of 6” pump control and diaphragm check valves
  • Discharge basin and pond area
  • Construction of gravel access road

Picacho MDWCA Turnkey Production Well

Las Cruces, NM
Company

Water Works, Sales, and Training for Water Professionals by Water Professionals

New Mexico

HQ AND SERVICE CENTER
748 WEST PALMS
LAS CRUCES, NM 88007
575-993-1511

Texas

OFFICE (BY APPOINTMENT)
7362 REMCON CIRCLE
EL PASO, TX 79912
915-490-2654

Arizona

OFFICE (BY APPOINTMENT)
3430 E SUNRISE DRIVE,
SUITE 180
TUCSON, AZ 85718
520-405-1028

Let's Talk

COPYRIGHT © 2021 | PUREOPS.COM |  ALL RIGHTS RESERVED | WEBSITE BY SPECTRUM TECHNOLOGIES

Loading...
New Hydro Instruments OMNI Valve after installation

Rio Well Chlorine Pacing Valve Replacement

New Hydro Instruments OMNI Valve after installation
Customer: Flagstaff Water Services
Design Engineer: PureOps
Location: Flagstaff, AZ
Date: April 2025
PureOps Price: $8,500

PureOps removes and replaces chlorine pacing valve at a well site in Flagstaff, AZ.

Scope of Work:

Site prep; remove existing equipment; install a new Hydro Instruments OMNI Valve; conduct startup, testing, and staff training

Scope of Supply:

  • (1) Hydro Instruments Wall Panel OMNI Valve, 0-25 PPD w/ Bypass Plumbing & VM-150 Vacuum Monitor
  • (1) Hydro Instruments Vertical In-Line Check Valve, 100 PPD Max
  • Miscellaneous tools and materials for installation
Existing non-operational chlorine pacing valve
Existing non-operational chlorine pacing valve
New Hydro Instruments OMNI Valve after installation
Training Flagstaff Water Services staff on new equipment
Training Flagstaff Water Services staff on new equipment
Explore

Rio Well Chlorine Pacing Valve Replacement

New Hydro Instruments OMNI Valve after installation
Customer: Flagstaff Water Services
Design Engineer: PureOps
Location: Flagstaff, AZ
Date: April 2025
PureOps Price: $8,500

PureOps removes and replaces chlorine pacing valve at a well site in Flagstaff, AZ.

Scope of Work:

Site prep; remove existing equipment; install a new Hydro Instruments OMNI Valve; conduct startup, testing, and staff training

Scope of Supply:

  • (1) Hydro Instruments Wall Panel OMNI Valve, 0-25 PPD w/ Bypass Plumbing & VM-150 Vacuum Monitor
  • (1) Hydro Instruments Vertical In-Line Check Valve, 100 PPD Max
  • Miscellaneous tools and materials for installation
Existing non-operational chlorine pacing valve
Existing non-operational chlorine pacing valve
New Hydro Instruments OMNI Valve after installation
Training Flagstaff Water Services staff on new equipment
Training Flagstaff Water Services staff on new equipment

Rio Well Chlorine Pacing Valve Replacement

Flagstaff, AZ
Finished Sand Separator installation

NMSU Well 10 Improvements

Finished Sand Separator installation
Customer: New Mexico State University
Design Engineer: PureOps
Location: Las Cruces, NM
Date: May 2025
PureOps Price: $190,000

PureOps replaces production well packing gland with mechanical seal, replaces LAKOS Sand Separator, and installs ProMinent chemical dosing pump skids at a domestic water production facility for New Mexico State University.

Scope of Work:

Remove production well packing gland and replace with new mechanical seal to include pulling of well head and motor, custom discharge head machining, resetting discharge head, and testing; Demolish and remove old LAKOS Sand Separator including 12” carbon steel piping, flanges, and on-site fabrication; Remove and replace existing chemical dosing pumps with automated ProMinent chemical pump skids and related piping connections.

Scope of Supply:

  • (1) John Crane Mechanical Seal, Machined Shaft and Related Accessories
  • (1) New ProMinent Polyphosphate Dual Pump Skid
  • (1) New ProMinent Sodium Hypochlorite Dual Pump Skid
  • (1) New LAKOS PWC-1080-L Sand Separator System with Auto Purge Valve, includes related piping, fittings, and fabrication services
Existing LAKOS Sand Separator before removal
Removed Sand Separator and installation preparation
New LAKOS Sand Separator during installation and fabrication
Removal of discharge head and packing gland
Removal of discharge head
Completed mechanical seal installation and resetting of discharge head
PureOps team member installing chemical pump skids
Completed ProMinent chemical pump skid
Explore

NMSU Well 10 Improvements

Finished Sand Separator installation
Customer: New Mexico State University
Design Engineer: PureOps
Location: Las Cruces, NM
Date: May 2025
PureOps Price: $190,000

PureOps replaces production well packing gland with mechanical seal, replaces LAKOS Sand Separator, and installs ProMinent chemical dosing pump skids at a domestic water production facility for New Mexico State University.

Scope of Work:

Remove production well packing gland and replace with new mechanical seal to include pulling of well head and motor, custom discharge head machining, resetting discharge head, and testing; Demolish and remove old LAKOS Sand Separator including 12” carbon steel piping, flanges, and on-site fabrication; Remove and replace existing chemical dosing pumps with automated ProMinent chemical pump skids and related piping connections.

Scope of Supply:

  • (1) John Crane Mechanical Seal, Machined Shaft and Related Accessories
  • (1) New ProMinent Polyphosphate Dual Pump Skid
  • (1) New ProMinent Sodium Hypochlorite Dual Pump Skid
  • (1) New LAKOS PWC-1080-L Sand Separator System with Auto Purge Valve, includes related piping, fittings, and fabrication services
Existing LAKOS Sand Separator before removal
Removed Sand Separator and installation preparation
New LAKOS Sand Separator during installation and fabrication
Removal of discharge head and packing gland
Removal of discharge head
Completed mechanical seal installation and resetting of discharge head
PureOps team member installing chemical pump skids
Completed ProMinent chemical pump skid

NMSU Well 10 Improvements

Las Cruces, NM

Smart Valve Replacement and ChlorTainer Maintenance

Customer: Fountain Hills Sanitary District
Design Engineer: PureOps
Location: Fountain Hills, AZ
Date: October 2024
PureOps Price: $16,000

PureOps performs upgrades for Fountain Hills Sanitary District including replacement of smart valves and annual service of ChlorTainer vessels.

Scope of Work:

Remove and replace vessel o-rings; remove and replace chlorine feed lines; repair and re-pack Whitey isolation valves; remove and replace closure locking nut gaskets; grease all lubrication ports and closure mechanisms; remove and replace (3) Regal Smart Valves with new units including vacuum tubing and tubing connectors; pressure and vacuum testing after completed work.

Scope of Supply:

  • (3) Regal Model 7001 Smart Valves Ranging from 100 to 500 PPD, Wall Mounting Plates, and Junction Boxes
  • (3) ChlorTainer Containment Vessel Service Package including:
    • Replacement of Vessel O-Rings
    • Chlorine Feed Lines, 38"
    • Whitey Isolation Valve Rebuild Kits
    • 40" Vessel w/ Closure Locking Nut Gasket
Explore

Smart Valve Replacement and ChlorTainer Maintenance

Customer: Fountain Hills Sanitary District
Design Engineer: PureOps
Location: Fountain Hills, AZ
Date: October 2024
PureOps Price: $16,000

PureOps performs upgrades for Fountain Hills Sanitary District including replacement of smart valves and annual service of ChlorTainer vessels.

Scope of Work:

Remove and replace vessel o-rings; remove and replace chlorine feed lines; repair and re-pack Whitey isolation valves; remove and replace closure locking nut gaskets; grease all lubrication ports and closure mechanisms; remove and replace (3) Regal Smart Valves with new units including vacuum tubing and tubing connectors; pressure and vacuum testing after completed work.

Scope of Supply:

  • (3) Regal Model 7001 Smart Valves Ranging from 100 to 500 PPD, Wall Mounting Plates, and Junction Boxes
  • (3) ChlorTainer Containment Vessel Service Package including:
    • Replacement of Vessel O-Rings
    • Chlorine Feed Lines, 38"
    • Whitey Isolation Valve Rebuild Kits
    • 40" Vessel w/ Closure Locking Nut Gasket

Smart Valve Replacement and ChlorTainer Maintenance

Fountain Hills, AZ

Vista Real Pressure Tank Replacement

Customer: Vista Real Mobile Home Park
Design Engineer: PureOps
Location: Las Cruces, NM
Date: June 2024
PureOps Price: $52,000

PureOps field crew performs the replacement of an aged and leaking hydropneumatic pressure tank and roof structure at the Vista Real Mobile Home Park.

Scope of Work:

Remove roof over tank building and prepare site for work; isolate wells from distribution system; drain old pressure tank; disconnect existing 2” galvanized steel plumbing from old pressure tank; subcontract with a crane services company for the removal of existing tank; hoist tank out of the station with crane and rigging; grind down and remove steel stand from concrete floor; install new schedule 80 PVC well piping to feed the bank of (4) new bladder tanks; install new 2” copper lines and pro-press fittings on distribution zones; connect distribution zones to the bladder tank manifold; pressure test and disinfect new piping and tanks; return the system back to service for the community; replace old roof with new framing and new roofing materials.

Scope of Supply:

  • (4) 185 Elbi Gallon Bladder Tanks
  • Various 2” PVC and 2” copper piping, fittings, and isolation valves
  • Various ancillary accessories / equipment (well control pressure switch, gauges, conduit, etc.)
  • Completely new roofing structure and roofing materials (elastomeric roof system)
Explore

Vista Real Pressure Tank Replacement

Customer: Vista Real Mobile Home Park
Design Engineer: PureOps
Location: Las Cruces, NM
Date: June 2024
PureOps Price: $52,000

PureOps field crew performs the replacement of an aged and leaking hydropneumatic pressure tank and roof structure at the Vista Real Mobile Home Park.

Scope of Work:

Remove roof over tank building and prepare site for work; isolate wells from distribution system; drain old pressure tank; disconnect existing 2” galvanized steel plumbing from old pressure tank; subcontract with a crane services company for the removal of existing tank; hoist tank out of the station with crane and rigging; grind down and remove steel stand from concrete floor; install new schedule 80 PVC well piping to feed the bank of (4) new bladder tanks; install new 2” copper lines and pro-press fittings on distribution zones; connect distribution zones to the bladder tank manifold; pressure test and disinfect new piping and tanks; return the system back to service for the community; replace old roof with new framing and new roofing materials.

Scope of Supply:

  • (4) 185 Elbi Gallon Bladder Tanks
  • Various 2” PVC and 2” copper piping, fittings, and isolation valves
  • Various ancillary accessories / equipment (well control pressure switch, gauges, conduit, etc.)
  • Completely new roofing structure and roofing materials (elastomeric roof system)

Vista Real Pressure Tank Replacement

Las Cruces, NM

AZ Water Association 97th Annual Conference

Location: Phoenix Convention Center
Date: April 2024

PureOps travels to Phoenix, AZ for the 97th Annual AZ Water Association Conference to exhibit, network, and scout.

Scope of Work:

Set up PureOps booth in exhibition hall; exhibit for a full 2 days during conference week; network with attendees and exchange contact information for potential new clients and leads; visit with existing customers, clients, and vendors; scout for potential candidates for 2 new positions within PureOps AZ; Give away fun branded promo items and swag bags; provide attendees with printed media including line cards, business cards, and hiring cards.

Additional Info:

The 97th Annual AZ Water Association Conference resulted in the highest attendance to date — nearly 3,000 attendees.

Explore

AZ Water Association 97th Annual Conference

Location: Phoenix Convention Center
Date: April 2024

PureOps travels to Phoenix, AZ for the 97th Annual AZ Water Association Conference to exhibit, network, and scout.

Scope of Work:

Set up PureOps booth in exhibition hall; exhibit for a full 2 days during conference week; network with attendees and exchange contact information for potential new clients and leads; visit with existing customers, clients, and vendors; scout for potential candidates for 2 new positions within PureOps AZ; Give away fun branded promo items and swag bags; provide attendees with printed media including line cards, business cards, and hiring cards.

Additional Info:

The 97th Annual AZ Water Association Conference resulted in the highest attendance to date — nearly 3,000 attendees.

AZ Water Association 97th Annual Conference

Phoenix, AZ

Fabens Meter Replacement

Customer: City of Fabens
Design Engineer: PureOps
Location: Fabens, TX
Date: July 2024
PureOps Price: $10,300

PureOps performs a 12” meter replacement in the late hours of the night to avoid water outages to the town of Fabens, TX.

Scope of Work:

Remove 12” McCrometer Mag Meter from booster station discharge manifold; clean piping and flange faces; install 12” E+H Mag Meter; check for leaks; install flow display wiring; check proper operation.

Scope of Supply:

  • (1) Endress + Hauser 12” Promag W 400, Mag Meter w/ Integral Display
Explore

Fabens Meter Replacement

Customer: City of Fabens
Design Engineer: PureOps
Location: Fabens, TX
Date: July 2024
PureOps Price: $10,300

PureOps performs a 12” meter replacement in the late hours of the night to avoid water outages to the town of Fabens, TX.

Scope of Work:

Remove 12” McCrometer Mag Meter from booster station discharge manifold; clean piping and flange faces; install 12” E+H Mag Meter; check for leaks; install flow display wiring; check proper operation.

Scope of Supply:

  • (1) Endress + Hauser 12” Promag W 400, Mag Meter w/ Integral Display

Fabens Meter Replacement

Fabens, TX