Skip to content

NM 575-993-1511

TX 915-490-2654

AZ 520-405-1028

Let's Connect

NM 575-993-1511

TX 915-490-2654

AZ 520-405-1028

Let's Connect
  • Water Works
  • Sales
    • Brands
    • Chemical Feed Systems
    • Flow Meters
    • Instrumentation / Automation
    • Process Equipment
    • Sales Engineering
    • Consulting / Design Review
    • Installation
    • Training and Support
  • Training
  • Company
    • Timeline
    • Projects
    • Culture
      • Mission & Vision
      • Founding Mottos
      • Principal Values
      • Guiding Philosophy
Menu
  • Water Works
  • Sales
    • Brands
    • Chemical Feed Systems
    • Flow Meters
    • Instrumentation / Automation
    • Process Equipment
    • Sales Engineering
    • Consulting / Design Review
    • Installation
    • Training and Support
  • Training
  • Company
    • Timeline
    • Projects
    • Culture
      • Mission & Vision
      • Founding Mottos
      • Principal Values
      • Guiding Philosophy
WATER WORKS, SALES, AND TRAINING FOR WATER PROFESSIONALS BY WATER PROFESSIONALS
Since 2004
OUR TRIED-AND-TRUE, CERTIFIED WATER PROFESSIONALS ARE YOUR WATER PROFESSIONALS TOO
Water Works
TOP-NOTCH WATER AND WASTEWATER PRODUCTS BACKED BY CERTIFIED OPERATORS
Sales
REAL-WORLD, INTEGRATIVE KNOWLEDGE — AND LIKABLE PEOPLE TO BOOT
Training

OPERATOR OF RECORD / OPERATOR SERVICES

Water Works

TROUBLESHOOTING / TECHNICAL ASSISTANCE

Water Works
Water Works

METER SERVICES

LEAK DETECTION

Water Works

CHEMICAL FEED SYSTEMS

Products

FLOW METERS

Products

INSTRUMENTATION / AUTOMATION

Products

PROCESS EQUIPMENT

Products

SALES
ENGINEERING

Service

INSTALLATION

Service

Certifications

NMED
TCEQ
ADEQ

CONSULTING / DESIGN REVIEW

Service

TRAINING AND SUPPORT

Service

PRODUCT / EQUIPMENT / TECH

Training

OPERATION & MAINTENANCE

Training

WATER
CERTIFICATION PREP

Training

PROFESSIONAL DEVELOPMENT

Training

OPERATOR OF RECORD/ OPERATOR SERVICES

Water Works

TROUBLESHOOTING / TECHNICAL ASSISTANCE

Water Works

METER SERVICES

Water Works

LEAK DETECTION

Water Works

CHEMICAL FEED SYSTEMS

Products

FLOW METERS

Products

INSTRUMENTATION / AUTOMATION

Products

PROCESS EQUIPMENT

Products

SALES ENGINEERING

Service

INSTALLATION

Service

Certifications

NMED
TCEQ
ADEQ

TRAINING AND SUPPORT

Service

CONSULTING / DESIGN REVIEW

Service

PRODUCT / EQUIPMENT / TECH

Training

OPERATION & MAINTENANCE

Training

WATER
CERTIFICATION PREP

Training

PROFESSIONAL DEVELOPMENT

Training

Featured Brands

hydro
MasterMeterLogo
Force Flow
Grundfos
HACH
Halogen
Endress hauser
Purafil_PMScoated
Evoqua-logo
Regal
Horizon Water

TESTIMONIALS

"

|

Following AWWA standards as a baseline makes sense. PureOps shows that doing more is possible and worthwhile.
Customer, North Central New Mexico
Customer, North Central New Mexico
I didn’t think there was much room for meter O&M improvement, then we worked with PureOps. Another level.
Customer, Central New Mexico
Customer, Central New Mexico
World-class service right here in New Mexico.
Customer, Southeast New Mexico
Customer, Southeast New Mexico
I trust these guys. They make all the difference and have our best interests in mind. Don’t look anywhere else.
Customer, North Central New Mexico

"

Featured Clients

elpasologo
CityofSantaFe-logo black
CityofLasCruces-logo
4.Carlsbad_New_Mexico_logo
logo-asus
5.NMSU
EP Electric scaled
Spaceport-logo
LosAlamos_logo
CityofRoswell-logo
CityofArtesia-logo
LowerRioGrandePWWA-logo
CityofHobbs_logo 1
JacobsTech-logo
15.Mesilla-logo
Projects

Water Works, Sales, and Training for Water Professionals by Water Professionals

New Mexico

HQ AND SERVICE CENTER
748 WEST PALMS
LAS CRUCES, NM 88007
575-993-1511

Texas

OFFICE (BY APPOINTMENT)
7362 REMCON CIRCLE
EL PASO, TX 79912
915-490-2654

Arizona

OFFICE (BY APPOINTMENT)
5151 E BROADWAY BLVD, SUITE 160
TUCSON, AZ 85711
520-405-1028

Let's Talk

COPYRIGHT © 2021 | PUREOPS.COM |  ALL RIGHTS RESERVED | WEBSITE BY SPECTRUM TECHNOLOGIES

Loading...

Town of Pecos Meter Replacement

Customer: Town of Pecos
Loacation: Pecos, TX
Date: 2017-2018, multiple project phases over the course of 18 months
PureOps Price: $150,000

PureOps replaces 28 turbine meters ranging from 3” to 6” throughout the Town of Pecos production well field.

  • Mobilization/demobilization
  • Decommissioned existing meters
  • Installed meters and related plumbing including new spools of pipe and flange adapters
  • Installed electrical conduit from control panels to meter locations, as well as new power supply leads and connections
  • Installed overload relays and communication via 4-20 mA signal
  • Start-up and testing of all equipment, including hydrostatic testing of plumbing and mechanical joints
Explore

Town of Pecos Meter Replacement

Customer: Town of Pecos
Loacation: Pecos, TX
Date: 2017-2018, multiple project phases over the course of 18 months
PureOps Price: $150,000

PureOps replaces 28 turbine meters ranging from 3” to 6” throughout the Town of Pecos production well field.

  • Mobilization/demobilization
  • Decommissioned existing meters
  • Installed meters and related plumbing including new spools of pipe and flange adapters
  • Installed electrical conduit from control panels to meter locations, as well as new power supply leads and connections
  • Installed overload relays and communication via 4-20 mA signal
  • Start-up and testing of all equipment, including hydrostatic testing of plumbing and mechanical joints

Town of Pecos Meter Replacement

Pecos, TX

El Paso Water Chlorine Gas System

Customer: El Paso Water
Loacation: El Paso, TX
Date: 2018, one-week project
PureOps Price: $55,000

PureOps de-and-re-commissions major gas chlorine system (24 one-ton cylinders) for El Paso Water, supplying and installing Hydro Instruments vacuum regulators (16,000 PPD), ball valves, chlorine filters, gauges, pressure relief valves, and related accessories.

  • Decommissioned existing wall mount chlorine vacuum regulators and manifold plumbing, including chlorine filters, ball valves, gauges, pressure relief valves, and related accessories
  • Supplied and installed two sets of Hydro Instruments 8000 PPD wall mount vacuum regulators, ball valves, chlorine filters, gauges, pressure relief valves, and related accessories
  • Tested pressure and vacuum on all equipment
Explore

El Paso Water Chlorine Gas System

Customer: El Paso Water
Loacation: El Paso, TX
Date: 2018, one-week project
PureOps Price: $55,000

PureOps de-and-re-commissions major gas chlorine system (24 one-ton cylinders) for El Paso Water, supplying and installing Hydro Instruments vacuum regulators (16,000 PPD), ball valves, chlorine filters, gauges, pressure relief valves, and related accessories.

  • Decommissioned existing wall mount chlorine vacuum regulators and manifold plumbing, including chlorine filters, ball valves, gauges, pressure relief valves, and related accessories
  • Supplied and installed two sets of Hydro Instruments 8000 PPD wall mount vacuum regulators, ball valves, chlorine filters, gauges, pressure relief valves, and related accessories
  • Tested pressure and vacuum on all equipment

El Paso Water Chlorine Gas System

El Paso, TX

Picacho MDWCA Turnkey Production Well

Customer: Picacho MDWCA
Loacation: Las Cruces, NM
Date: 2012-2013, three-month project
Customer Estimated Cost: $240,000
PureOps Price: $110,000

PureOps completes first turnkey production well (300-gallon), with all the bells and whistles — and the well building to boot — serving the needs of Picacho MDWCA.

Supply and Installation of Equipment

  • Clamp-on ultrasonic flow meter
  • Polyphosphate injection system
  • Chlorine gas injection system, including chlorine scales, automatic shut off actuators, gas detection equipment, injection booster pump, and chlorine residual analyzer
  • Motor controls and all related electrical and SCADA equipment

Construction of 24’ x 13’ Well House

  • Cement pad and foundation
  • Tie-in newly drilled well to the distribution system
  • Installation of 6” pump control and diaphragm check valves
  • Discharge basin and pond area
  • Construction of gravel access road
Explore

Picacho MDWCA Turnkey Production Well

Customer: Picacho MDWCA
Loacation: Las Cruces, NM
Date: 2012-2013, three-month project
Customer Estimated Cost: $240,000
PureOps Price: $110,000

PureOps completes first turnkey production well (300-gallon), with all the bells and whistles — and the well building to boot — serving the needs of Picacho MDWCA.

Supply and Installation of Equipment

  • Clamp-on ultrasonic flow meter
  • Polyphosphate injection system
  • Chlorine gas injection system, including chlorine scales, automatic shut off actuators, gas detection equipment, injection booster pump, and chlorine residual analyzer
  • Motor controls and all related electrical and SCADA equipment

Construction of 24’ x 13’ Well House

  • Cement pad and foundation
  • Tie-in newly drilled well to the distribution system
  • Installation of 6” pump control and diaphragm check valves
  • Discharge basin and pond area
  • Construction of gravel access road

Picacho MDWCA Turnkey Production Well

Las Cruces, NM