CHEMICAL FEED SYSTEMS:
CHEMICAL DOSING PUMPS
PROCESS EQUIPMENT:
MIXERS
CHEMICAL FEED SYSTEMS:
CHEMICAL DOSING PUMPS
PROCESS EQUIPMENT:
MIXERS
Water Works, Sales, and Training for Water Professionals by Water Professionals
HQ AND SERVICE CENTER
748 WEST PALMS
LAS CRUCES, NM 88007
575-993-1511
OFFICE (BY APPOINTMENT)
7362 REMCON CIRCLE
EL PASO, TX 79912
915-490-2654
OFFICE (BY APPOINTMENT)
3430 E SUNRISE DRIVE,
SUITE 180
TUCSON, AZ 85718
520-405-1028
PureOps removes and replaces chlorine pacing valve at a well site in Flagstaff, AZ.
Scope of Work:
Site prep; remove existing equipment; install a new Hydro Instruments OMNI Valve; conduct startup, testing, and staff training
Scope of Supply:
PureOps removes and replaces chlorine pacing valve at a well site in Flagstaff, AZ.
Scope of Work:
Site prep; remove existing equipment; install a new Hydro Instruments OMNI Valve; conduct startup, testing, and staff training
Scope of Supply:
PureOps replaces production well packing gland with mechanical seal, replaces LAKOS Sand Separator, and installs ProMinent chemical dosing pump skids at a domestic water production facility for New Mexico State University.
Scope of Work:
Remove production well packing gland and replace with new mechanical seal to include pulling of well head and motor, custom discharge head machining, resetting discharge head, and testing; Demolish and remove old LAKOS Sand Separator including 12” carbon steel piping, flanges, and on-site fabrication; Remove and replace existing chemical dosing pumps with automated ProMinent chemical pump skids and related piping connections.
Scope of Supply:
PureOps replaces production well packing gland with mechanical seal, replaces LAKOS Sand Separator, and installs ProMinent chemical dosing pump skids at a domestic water production facility for New Mexico State University.
Scope of Work:
Remove production well packing gland and replace with new mechanical seal to include pulling of well head and motor, custom discharge head machining, resetting discharge head, and testing; Demolish and remove old LAKOS Sand Separator including 12” carbon steel piping, flanges, and on-site fabrication; Remove and replace existing chemical dosing pumps with automated ProMinent chemical pump skids and related piping connections.
Scope of Supply:
PureOps performs upgrades for Fountain Hills Sanitary District including replacement of smart valves and annual service of ChlorTainer vessels.
Scope of Work:
Remove and replace vessel o-rings; remove and replace chlorine feed lines; repair and re-pack Whitey isolation valves; remove and replace closure locking nut gaskets; grease all lubrication ports and closure mechanisms; remove and replace (3) Regal Smart Valves with new units including vacuum tubing and tubing connectors; pressure and vacuum testing after completed work.
Scope of Supply:
PureOps performs upgrades for Fountain Hills Sanitary District including replacement of smart valves and annual service of ChlorTainer vessels.
Scope of Work:
Remove and replace vessel o-rings; remove and replace chlorine feed lines; repair and re-pack Whitey isolation valves; remove and replace closure locking nut gaskets; grease all lubrication ports and closure mechanisms; remove and replace (3) Regal Smart Valves with new units including vacuum tubing and tubing connectors; pressure and vacuum testing after completed work.
Scope of Supply:
PureOps field crew performs the replacement of an aged and leaking hydropneumatic pressure tank and roof structure at the Vista Real Mobile Home Park.
Scope of Work:
Remove roof over tank building and prepare site for work; isolate wells from distribution system; drain old pressure tank; disconnect existing 2” galvanized steel plumbing from old pressure tank; subcontract with a crane services company for the removal of existing tank; hoist tank out of the station with crane and rigging; grind down and remove steel stand from concrete floor; install new schedule 80 PVC well piping to feed the bank of (4) new bladder tanks; install new 2” copper lines and pro-press fittings on distribution zones; connect distribution zones to the bladder tank manifold; pressure test and disinfect new piping and tanks; return the system back to service for the community; replace old roof with new framing and new roofing materials.
Scope of Supply:
PureOps field crew performs the replacement of an aged and leaking hydropneumatic pressure tank and roof structure at the Vista Real Mobile Home Park.
Scope of Work:
Remove roof over tank building and prepare site for work; isolate wells from distribution system; drain old pressure tank; disconnect existing 2” galvanized steel plumbing from old pressure tank; subcontract with a crane services company for the removal of existing tank; hoist tank out of the station with crane and rigging; grind down and remove steel stand from concrete floor; install new schedule 80 PVC well piping to feed the bank of (4) new bladder tanks; install new 2” copper lines and pro-press fittings on distribution zones; connect distribution zones to the bladder tank manifold; pressure test and disinfect new piping and tanks; return the system back to service for the community; replace old roof with new framing and new roofing materials.
Scope of Supply:
PureOps travels to Phoenix, AZ for the 97th Annual AZ Water Association Conference to exhibit, network, and scout.
Scope of Work:
Set up PureOps booth in exhibition hall; exhibit for a full 2 days during conference week; network with attendees and exchange contact information for potential new clients and leads; visit with existing customers, clients, and vendors; scout for potential candidates for 2 new positions within PureOps AZ; Give away fun branded promo items and swag bags; provide attendees with printed media including line cards, business cards, and hiring cards.
Additional Info:
The 97th Annual AZ Water Association Conference resulted in the highest attendance to date — nearly 3,000 attendees.
PureOps travels to Phoenix, AZ for the 97th Annual AZ Water Association Conference to exhibit, network, and scout.
Scope of Work:
Set up PureOps booth in exhibition hall; exhibit for a full 2 days during conference week; network with attendees and exchange contact information for potential new clients and leads; visit with existing customers, clients, and vendors; scout for potential candidates for 2 new positions within PureOps AZ; Give away fun branded promo items and swag bags; provide attendees with printed media including line cards, business cards, and hiring cards.
Additional Info:
The 97th Annual AZ Water Association Conference resulted in the highest attendance to date — nearly 3,000 attendees.
PureOps performs a 12” meter replacement in the late hours of the night to avoid water outages to the town of Fabens, TX.
Scope of Work:
Remove 12” McCrometer Mag Meter from booster station discharge manifold; clean piping and flange faces; install 12” E+H Mag Meter; check for leaks; install flow display wiring; check proper operation.
Scope of Supply:
PureOps performs a 12” meter replacement in the late hours of the night to avoid water outages to the town of Fabens, TX.
Scope of Work:
Remove 12” McCrometer Mag Meter from booster station discharge manifold; clean piping and flange faces; install 12” E+H Mag Meter; check for leaks; install flow display wiring; check proper operation.
Scope of Supply: