Skip to content

NM 575-993-1511

TX 915-490-2654

AZ 520-405-1028

Let's Connect

NM 575-993-1511

TX 915-490-2654

AZ 520-405-1028

Let's Connect
  • Water Works
  • Sales
    • Brands
    • Chemical Feed Systems
    • Flow Meters
    • Instrumentation / Automation
    • Process Equipment
    • Sales Engineering
    • Consulting / Design Review
    • Installation
    • Training and Support
  • Training
  • Company
    • Timeline
    • Projects
    • Culture
      • Mission & Vision
      • Founding Mottos
      • Principal Values
      • Guiding Philosophy
  • Water Works
  • Sales
    • Brands
    • Chemical Feed Systems
    • Flow Meters
    • Instrumentation / Automation
    • Process Equipment
    • Sales Engineering
    • Consulting / Design Review
    • Installation
    • Training and Support
  • Training
  • Company
    • Timeline
    • Projects
    • Culture
      • Mission & Vision
      • Founding Mottos
      • Principal Values
      • Guiding Philosophy

Installation

Installation

If a customer wants to install their purchase on their lonesome, we’re on standby in case anything changes, only a phone call or message away. If a customer wants technical support, we’re there digitally or in the background physically. If a customer wants installation support, we’re hands on right by their side. If a customer wants installation included, we’ll take care of it. And turnkey or start-up service, no problem either. In other words, our water professionals have all your installation needs covered.
Sales

Water Works, Sales, and Training for Water Professionals by Water Professionals

New Mexico

HQ AND SERVICE CENTER
748 WEST PALMS
LAS CRUCES, NM 88007
575-993-1511

Texas

OFFICE (BY APPOINTMENT)
7362 REMCON CIRCLE
EL PASO, TX 79912
915-490-2654

Arizona

OFFICE (BY APPOINTMENT)
3430 E SUNRISE DRIVE,
SUITE 180
TUCSON, AZ 85718
520-405-1028

Let's Talk

COPYRIGHT © 2021 | PUREOPS.COM |  ALL RIGHTS RESERVED | WEBSITE BY SPECTRUM TECHNOLOGIES

Loading...

NMSU Transfer Pump Station Improvements

Customer: New Mexico State University
Location: Las Cruces, NM
Date: January 2025

PureOps gives the NMSU Transfer Pump Station a “facelift” including cleaning, new paint, and other aesthetic improvements.

Scope of Work:

Remove old paint from floors and piping; prep pumps and piping for new paint; clean room; paint pumps and piping.

Scope of Supply:

  • New primer and paint
  • Misc. tools & materials
Explore

NMSU Transfer Pump Station Improvements

Customer: New Mexico State University
Location: Las Cruces, NM
Date: January 2025

PureOps gives the NMSU Transfer Pump Station a “facelift” including cleaning, new paint, and other aesthetic improvements.

Scope of Work:

Remove old paint from floors and piping; prep pumps and piping for new paint; clean room; paint pumps and piping.

Scope of Supply:

  • New primer and paint
  • Misc. tools & materials

NMSU Transfer Pump Station Improvements

Las Cruces, NM

Resort Cl2 Installation

Customer: West Texas Resort
Design Engineer: PureOps
Location: West Texas
Date: August 2024
PureOps Price: $53,500

PureOps installs a complete chlorination system at a resort located in West Texas.

Scope of Work:

PureOps removes old chlorine gas system to include electrical, plumbing, and existing scales; conducts site preparations which includes removal of old mounting panels and hardware; installs new chlorine gas feed equipment, scales, booster pump, and safety shut off system; conducts full startup and training services for the customer; and leaves the site with the new system in working order

Scope of Supply:

  • (4) Hydro Instruments Series 900 Automatic Switchover Vacuum Regulator with Slide Bar Yoke
  • (2) Hydro Instruments Vertical In-Line Check Valve
  • (2) Hydro Instruments Chlorine Ejector, #2 Nozzle w/ Mounting Bracket
  • (2) Hydro Instruments Remote Meter Panel for Chlorine Gas, 6" Tube
  • (2) Hydro Instruments 1” Water Inlet Assembly w/ Y-strainer, PSI Pressure Gauge and True-Union Ball Valve
  • (2) Hydro Instruments Diaphragm Protected Pressure Gauge w/2.5" Dial
  • (1) Grundfos CR 3-9 Booster Pump, ANSI Flange Connections, Includes Companion Flanges
  • (1) Hydro Instruments Chlorine Gas Detector, Dual Sensor w/ Battery Backup
  • (2) Force Flow Dual Electronic Cylinder Scale w/ Solo G2 Weight Indicator
  • (1) SCOTT Industrial SCBA System, 2216 PSI
  • (2) Halogen Terminator Actuators & Control Panels for 150 lb Cylinders
  • (1) Gemini Control Panel w/ (2) Gravity Mount Terminator Actuators with 6 ft. Cables
  • (1) Misc. Parts
Explore

Resort Cl2 Installation

Customer: West Texas Resort
Design Engineer: PureOps
Location: West Texas
Date: August 2024
PureOps Price: $53,500

PureOps installs a complete chlorination system at a resort located in West Texas.

Scope of Work:

PureOps removes old chlorine gas system to include electrical, plumbing, and existing scales; conducts site preparations which includes removal of old mounting panels and hardware; installs new chlorine gas feed equipment, scales, booster pump, and safety shut off system; conducts full startup and training services for the customer; and leaves the site with the new system in working order

Scope of Supply:

  • (4) Hydro Instruments Series 900 Automatic Switchover Vacuum Regulator with Slide Bar Yoke
  • (2) Hydro Instruments Vertical In-Line Check Valve
  • (2) Hydro Instruments Chlorine Ejector, #2 Nozzle w/ Mounting Bracket
  • (2) Hydro Instruments Remote Meter Panel for Chlorine Gas, 6" Tube
  • (2) Hydro Instruments 1” Water Inlet Assembly w/ Y-strainer, PSI Pressure Gauge and True-Union Ball Valve
  • (2) Hydro Instruments Diaphragm Protected Pressure Gauge w/2.5" Dial
  • (1) Grundfos CR 3-9 Booster Pump, ANSI Flange Connections, Includes Companion Flanges
  • (1) Hydro Instruments Chlorine Gas Detector, Dual Sensor w/ Battery Backup
  • (2) Force Flow Dual Electronic Cylinder Scale w/ Solo G2 Weight Indicator
  • (1) SCOTT Industrial SCBA System, 2216 PSI
  • (2) Halogen Terminator Actuators & Control Panels for 150 lb Cylinders
  • (1) Gemini Control Panel w/ (2) Gravity Mount Terminator Actuators with 6 ft. Cables
  • (1) Misc. Parts

Resort Cl2 Installation

West Texas

Chlorine Scrubber Replacement Project

Customer: El Paso Water Utilities
Design Engineer: Freese and Nichols
Location: El Paso, TX
Date: September 2023
PureOps Price: $360,000

PureOps assists Smithco Construction with the engineering and replacement of an existing wet scrubber with a new Dry Scrubber from Purafil (AOC1), including necessary FRP ducting and chlorine gas sensors.

Scope of Work:

Replace old wet scrubber with the new Purafil AOC1 dry scrubber; assist with installation of the FRP ducting; perform startup and training for the end user

Scope of Supply:

  • (1) Purafil AOC1 Dry Scrubber for Chlorine Gas
  • (1) FRP Ducting for new scrubber, including actuated damper, fittings, and glass kits
  • (1) Set of Sensidyne chlorine gas detectors for the chlorine storage area and stack alarm sensor
Explore

Chlorine Scrubber Replacement Project

Customer: El Paso Water Utilities
Design Engineer: Freese and Nichols
Location: El Paso, TX
Date: September 2023
PureOps Price: $360,000

PureOps assists Smithco Construction with the engineering and replacement of an existing wet scrubber with a new Dry Scrubber from Purafil (AOC1), including necessary FRP ducting and chlorine gas sensors.

Scope of Work:

Replace old wet scrubber with the new Purafil AOC1 dry scrubber; assist with installation of the FRP ducting; perform startup and training for the end user

Scope of Supply:

  • (1) Purafil AOC1 Dry Scrubber for Chlorine Gas
  • (1) FRP Ducting for new scrubber, including actuated damper, fittings, and glass kits
  • (1) Set of Sensidyne chlorine gas detectors for the chlorine storage area and stack alarm sensor

Chlorine Scrubber Replacement Project

El Paso, TX

Complete Chlorination System Replacement and Upgrade

Customer: City of Tolleson
Design Engineer: PureOps
Location: Tolleson, AZ
Date: November 2024
PureOps Price: $77,000

PureOps removes and replaces the entire one-ton chlorine gas feed system for the Tolleson WWTP.

Scope of Work:

Coordinate with Tolleson WWTP staff to temporarily inject Sodium Hypochlorite (NaOCl) for disinfection of wastewater during the removal and replacement of current chlorine gas injection system; Remove all obsolete and aged chlorine gas injection equipment including ejectors, vacuum regulators, pacing valves, related plumbing; Install all new equipment and add a safety shutoff system from Halogen to give the operations team an added layer of safety when working with chlorine gas; Replace all of the PVC chlorine gas vacuum lines as well as the chlorine solution manifold by request of the WWTP supervisor while onsite, as the piping was brittle and compromised; Upon complete installation, perform a full startup, testing, and operator training in order to get the plant back online safely; PureOps and the Tolleson team planned to inject temporary Sodium Hypochlorite (NaOCl) for an entire week, however, the service team worked through the night to get the WWTP back online with chlorine gas in 48 hours.

Scope of Supply:

  • (2) Hydro Instruments 2" Chlorine Gas Ejector, Variable Orifice, 2,000 PPD Max
  • (2) Hydro Instruments Secondary Check Valve for Chlorine Ejectors
  • (4) Hydro Instruments Series 300 Ton Mount Vacuum Regulator for Chlorine Gas, 0-500 PPD
  • (1) Hydro Instruments GA-180 Chlorine Gas Detector, 4 Sensors
  • (1) Hydro Instruments Pacing Valve for Chlorine Gas, 1" NPT Bypass Plumbing, 12" Remote Meter Panel 2,000 PPD & 120V Vacuum Monitor (0-30" Hg)
  • (1) Halogen Valve Systems Hexacon - III Emergency Shutoff Actuator System for Three (3) One-Ton Chlorine Containers.
  • (3) Wall mount Storage Brackets for Actuators
  • (2) Remote Emergency Shutoff Switch (Panic Buttons) for Exit Doors Spare Equipment, Sensors, and Parts Needed for Future Repairs and Troubleshooting
  • Operation & Maintenance Manuals on All Equipment
Explore

Complete Chlorination System Replacement and Upgrade

Customer: City of Tolleson
Design Engineer: PureOps
Location: Tolleson, AZ
Date: November 2024
PureOps Price: $77,000

PureOps removes and replaces the entire one-ton chlorine gas feed system for the Tolleson WWTP.

Scope of Work:

Coordinate with Tolleson WWTP staff to temporarily inject Sodium Hypochlorite (NaOCl) for disinfection of wastewater during the removal and replacement of current chlorine gas injection system; Remove all obsolete and aged chlorine gas injection equipment including ejectors, vacuum regulators, pacing valves, related plumbing; Install all new equipment and add a safety shutoff system from Halogen to give the operations team an added layer of safety when working with chlorine gas; Replace all of the PVC chlorine gas vacuum lines as well as the chlorine solution manifold by request of the WWTP supervisor while onsite, as the piping was brittle and compromised; Upon complete installation, perform a full startup, testing, and operator training in order to get the plant back online safely; PureOps and the Tolleson team planned to inject temporary Sodium Hypochlorite (NaOCl) for an entire week, however, the service team worked through the night to get the WWTP back online with chlorine gas in 48 hours.

Scope of Supply:

  • (2) Hydro Instruments 2" Chlorine Gas Ejector, Variable Orifice, 2,000 PPD Max
  • (2) Hydro Instruments Secondary Check Valve for Chlorine Ejectors
  • (4) Hydro Instruments Series 300 Ton Mount Vacuum Regulator for Chlorine Gas, 0-500 PPD
  • (1) Hydro Instruments GA-180 Chlorine Gas Detector, 4 Sensors
  • (1) Hydro Instruments Pacing Valve for Chlorine Gas, 1" NPT Bypass Plumbing, 12" Remote Meter Panel 2,000 PPD & 120V Vacuum Monitor (0-30" Hg)
  • (1) Halogen Valve Systems Hexacon - III Emergency Shutoff Actuator System for Three (3) One-Ton Chlorine Containers.
  • (3) Wall mount Storage Brackets for Actuators
  • (2) Remote Emergency Shutoff Switch (Panic Buttons) for Exit Doors Spare Equipment, Sensors, and Parts Needed for Future Repairs and Troubleshooting
  • Operation & Maintenance Manuals on All Equipment

Complete Chlorination System Replacement and Upgrade

Tolleson, AZ

Cla-Val Training

Location: Costa Mesa, CA
Date: October 2024

PureOps travels to Southern California to participate in the Cal-Val 101/201 training at their 20+ acre headquarters.

Scope of Work:

PureOps-ers Brandon and Miguel undertook a three-day, mixed-format training at Cla-Val University, including formal instruction, hands-on training, and a complete factory tour. The coursework covered the fundamentals of control valves as well as a deep dive into solenoid-operated valves, altitude valves, multi-pilot control valves, and new technologies being developed by Cal-Val.

Additional Info:

Since 1936, Cla-Val has been known as the leading manufacturer of automatic control valves and has built a well-earned reputation for providing superior quality products designed for mission-critical water distribution solutions throughout the United States and around the world. Cla-Val moved to its present home and worldwide headquarters in Costa Mesa, California in 1954. Today, they are the only valve manufacturer in the world with two in-house foundries.

Explore

Cla-Val Training

Location: Costa Mesa, CA
Date: October 2024

PureOps travels to Southern California to participate in the Cal-Val 101/201 training at their 20+ acre headquarters.

Scope of Work:

PureOps-ers Brandon and Miguel undertook a three-day, mixed-format training at Cla-Val University, including formal instruction, hands-on training, and a complete factory tour. The coursework covered the fundamentals of control valves as well as a deep dive into solenoid-operated valves, altitude valves, multi-pilot control valves, and new technologies being developed by Cal-Val.

Additional Info:

Since 1936, Cla-Val has been known as the leading manufacturer of automatic control valves and has built a well-earned reputation for providing superior quality products designed for mission-critical water distribution solutions throughout the United States and around the world. Cla-Val moved to its present home and worldwide headquarters in Costa Mesa, California in 1954. Today, they are the only valve manufacturer in the world with two in-house foundries.

Cla-Val Training

Costa Mesa, CA

Glendale Aquatics Vacuum Regulator Replacement

Customer: Glendale Aquatics
Location: Glendale, AZ
Date: May 2024
PureOps Price: $15,000

PureOps replaces (6) old Regal Vacuum Regulators with new Regal units for an aquatics center in Glendale, AZ. PureOps also supplied the customer with additional Regal Vacuum Regulators for another pool site and shelf spares.

Scope of Work:

Remove old vacuum regulators and vacuum tubing; install new vacuum regulators and vacuum tubing with appropriate fittings; and provide training to on-site staff covering the proper safety and operation practices of chlorine gas injection systems

Scope of Supply:

(10) Regal Model A-826 Vacuum Regulators, assorted vacuum tubing fittings, and
roughly 300’ of vacuum tubing

Explore

Glendale Aquatics Vacuum Regulator Replacement

Customer: Glendale Aquatics
Location: Glendale, AZ
Date: May 2024
PureOps Price: $15,000

PureOps replaces (6) old Regal Vacuum Regulators with new Regal units for an aquatics center in Glendale, AZ. PureOps also supplied the customer with additional Regal Vacuum Regulators for another pool site and shelf spares.

Scope of Work:

Remove old vacuum regulators and vacuum tubing; install new vacuum regulators and vacuum tubing with appropriate fittings; and provide training to on-site staff covering the proper safety and operation practices of chlorine gas injection systems

Scope of Supply:

(10) Regal Model A-826 Vacuum Regulators, assorted vacuum tubing fittings, and
roughly 300’ of vacuum tubing

Glendale Aquatics Vacuum Regulator Replacement